• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (h)
 Install the new cotter pin (75) to the nut (76).


 (25)
 Apply a layer of SEALANTS (Material No. 09-001) to the areas identified E.

 (26)
 Make sure that the lubrication points are clean and in good condition on the pin (61).

 (27)
 Remove the blanking plugs and connect the electrical connector (62) to the electrical connector (68).

 (28)
 Install the clamp (64), the washer (65) and the nut (66). Tighten the nut (66).


 Subtask 32-21-13-420-051
 C. End of the Installation
 (1)
 Install the support (24) and put the bundle (23) in the axle.

 (2)
 Install the bolt (20) with its head up and install the nut (26).

 (3)
 TORQUE the nut (26) to between 1.7 and 2 m.daN (12.53 and 14.74 lbf.ft) and safety it with a cotter pin (25).

 (4)
 Remove the blanking plugs and connect the electrical connectors (22) to the plugs (21).

 (5)
 Install the plugs (21) on the end of the axle.


R 1EFF : 001-004, 051-054, 1 32-21-13Page 427 1 1 May 01/05 1 1 1CES 1


 (6) Install the wheels on the nose landing gear (Ref. TASK 32-41-12-400-001).
 NOTE : Lower the aircraft to make the installation of the wheels
____
 easier.

 (7) Install the towing fitting (Ref. TASK 32-21-41-400-001). R **ON A/C 005-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 32-21-13-110-051-A
 A. Preparation for Installation
 (1)
 Clean all the removed parts with CLEANING AGENTS (Material No. 11-001) and dry them with compressed air.

 (2)
 Make sure that the parts and the chromed surfaces are in the correct condition.

 (3)
 Make sure that the three friction pads (11) are in position in the upper part of the shock strut.

 (4)
 Make sure that the scraper (14) is in the correct condition. Replace the scraper (14) if necessary.

 (5)
 To prevent damage to the scraper (14) during installation, install it on the shock absorber (10). You will push the scraper (14) in its housing when you engage the shock absorber in the upper bearing.

 (6)
 Systematically replace the seal (13) and the ring (12).

 (7)
 Apply a thin layer of COMMON GREASE (Material No. 04-022) to the pin

 (59) and to the bores of the torque link arms.

 (8)
 Clean the attachment hardware with CLEANING AGENTS (Material No. 11-004A) and dry them with filtered compressed air.

 (9)
 Apply a light coat of SPECIAL MATERIALS (Material No. 05-047) to the threads of all the nuts, screws, bolts and pins.


 (10)
 Apply a light layer of SPECIAL MATERIALS (Material No. 05-047) to the threaded parts and the stop plate (4).

 (11)
 Apply a light layer of SPECIAL MATERIALS (Material No. 05-047) to the lugs of the shock absorber upper part.


 1EFF : ALL 1 32-21-13Page 428 1 1 Aug 01/05 1 1 1CES 1 Subtask 32-21-13-420-052-A


 B. Installation of the Shock Absorber Assy CAUTION : WHEN YOU INSTALL THE SHOCK ABSORBER, MAKE SURE THAT YOU ALIGN
_______ THE PISTON LUGS WITH THE SLOTS IN THE SHOCK STRUT BACKPLATE. THE SHOCK ABSORBER WILL THUS BE IN THE CORRECT POSITION (THE WHEEL AXLE PERPENDICULAR TO THE AIRCRAFT CENTERLINE). AN INCORRECT INSTALLATION CAN CAUSE IMPORTANT DAMAGE TO THE NLG.
 (1)
 Install the shock absorber on the lifting trolley .

 (2)
 Install the GUIDE CONE (J47999) on the threaded part of the sliding tube.

 (3)
 Release the nitrogen pressure and fully compress the shock absorber.

 (4)
 Make sure that the bush (9) is in position on the shock absorber (10).

 (5)
 Slowly engage the shock absorber in the shock strut. Be careful not to cause damage to the friction pads (11) when the shock absorber goes near the upper self-aligning bearing.

 (6)
 Push the scraper (14) in its housing.

 (7)
 Lift the shock absorber (10) so as to align the lugs of the piston with the slots in the shock-strut backplate (8).

 (8)
 Remove the GUIDE CONE (J47999) from the threaded part of the sliding tube.


 NOTE : When the shock absorber (10) is fully engaged in the top of
____ the shock strut (7), the length of the thread (15) that you can see is between 17 and 18 mm (0.67 and 0.71 in.).
 (9) Install and tighten the nut (6) with the WRENCH (J47564) to between 22 and 25 m.daN (162.24 and 184.36 lbf.ft).
 (10) Install the charging valve:
 (a)
 Install the stop plate (4).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(85)