 (1)
 In the cockpit, on the panel 400VU, put warning notice(s) in position to tell persons not to operate the landing gear control lever.

 (2)
 Put the warning notice(s) in position to tell persons not pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system, access

 door (197CB).

 (3)
 Put the safety barriers in position.

 (4)
 Put a container for hydraulic fluid in position.

 (5)
 Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. TASK 32-00-00-860-001).


 Subtask 32-21-11-865-058
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34
R **ON A/C 051-099,
R 121VU HYDRAULIC/TIRE/PRESS 1GV M31
 1EFF : ALL 1 32-21-11Page 403 1 1 May 01/05 1 1 1CES 1 1EFF : ALL 1 32-21-11Page 404 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 32-21-11Page 405 1 1 Aug 01/05 1 1 1CES 1


 **ON A/C ALL
 Subtask 32-21-11-010-053
 C. Get Access
 (1) Open the doors of the nose landing gear (Ref. TASK 32-22-00-010-001).
 (2) Put the access platform in position in zone 123. 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 32-21-11-860-053
 D. Aircraft Maintenance Configuration
 (1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001)
 (2) Depressurize the reservoir of the Green hydraulic system. (Ref. TASK 29-14-00-614-001)
 (3) Depressurize the nose gear shock absorber. To do this act on the charging valve at the top of the shock absorber, as follows:
 (a) Remove the blanking cap from the charging valve.
 (b) Slowly open the valve by one and a half turns maximum.
 (4) Lift the aircraft with jacks (Ref. TASK 07-11-00-581-001).
 (5) Use a spatula to remove sealants from the mechanicals parts. 
R  **ON A/C 401-499, 
R  Subtask 32-21-11-860-053-A 
R  D. Aircraft Maintenance Configuration 
R R R  (1) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001)

 

R  (2) Depressurize the reservoir of the Yellow hydraulic system. 
R  (Ref. TASK 29-14-00-614-001) 
R  (3) Depressurize the nose gear shock absorber. To do this act on the 
R  charging valve at the top of the shock absorber, as follows: 
R  (a) Remove the blanking cap from the charging valve. 
R  (b) Slowly open the valve by one and a half turns maximum. 
R  (4) Lift the aircraft with jacks (Ref. TASK 07-11-00-581-001). 
R  (5) Use a spatula to remove sealants from the mechanicals parts. 
R  **ON A/C ALL
 4. Procedure_________
 (Ref. Fig. 401/TASK 32-21-11-991-008, 402/TASK 32-21-11-991-009, 403/TASK
 32-21-11-991-010, 404/TASK 32-21-11-991-011, 405/TASK 32-21-11-991-012,
 406/TASK 32-21-11-991-013-A)
 Subtask 32-21-11-020-054
 A. Preparation of the NLG before Removal
 (1) Remove the NLG aft doors (Ref. TASK 32-22-13-000-001).
 (2) Remove the leg door assy (Ref. TASK 32-22-15-000-001).
 (3) Remove the swivel selector valve (Ref. TASK 32-51-15-000-001).
 (4) Remove the NLG wheels 2659GM, 2660GM (Ref. TASK 32-41-12-000-001).
 (5) Remove the taxi light 8LR (Ref. TASK 33-46-12-000-001).
 (6) Remove the take-off light 7LR (Ref. TASK 33-46-11-000-001).
 (7) Remove the runway turnoff light (Ref. TASK 33-43-11-000-001).
 (8) Remove the towing fitting (Ref. TASK 32-21-41-000-001).

 

 Installation of the Tool Figure 401/TASK 32-21-11-991-008
 1EFF : 1 1R 1CES  ALL  1 11 1 32-21-11 Page 406 Aug 01/05

 

 Electrical and Hydraulic Connections Figure 402/TASK 32-21-11-991-009
 1EFF : 1 1R 1CES  ALL  1 11 1 32-21-11 Page 407 Aug 01/05

 


 