R  7_  Tighten the nut (69).
R  (Ref. Fig. 405A/TASK 32-21-27-991-003-A) 
R  8_  Put the rods (138) in position. Install the screws (141), the
R  washers (143) and the nuts (144). 
R  9_  TORQUE the nuts (144) to between 0.6 and 0.75 m.daN (53.09 and
R  66.37 lbf.in). 
R  10__  Safety the nuts (144) with the new cotter pin (142).
R  (b) If you have the alternative solution 2 
R  1_  Put the casing (137) in position on the screw (146).
R  2_  Install the screw (139) and the new lockwasher (140).
R  3_  Tighten the screw (139) and safety it with the lockwasher
R  (140). 
R  4_  Install the indicator (135) on the screw (146).
R  5_  Install the screw (134), the washer (133), the spacers (136),
R  the washer (132) and the nut (131). 
R  6_  TORQUE the nut (131) to between 0.6 and 0.7 m.daN (53.09 and
R  61.94 lbf.in).

 

R  7_  Tighten the nut (69).
R  (Ref. Fig. 405A/TASK 32-21-27-991-003-A) 
R  8_  Put the rods (138) in position. Install the screws (141), the
R  washers (143) and the nuts (144). 
R  9_  TORQUE the nuts (144) to between 0.6 and 0.75 m.daN (53.09 and
R  66.37 lbf.in). 
R  10__  Safety the nuts (144) with the new cotter pin (142).
R  (4) Connect the center hinge 
R  (Ref. Fig. 402/TASK 32-21-27-991-001) 
R  (a) Make sure that there is no friction point when each torque link 
R  arm moves. 
R  (b) Clean the threads of the shaft (1) and the nut (6) with CLEANING 
R  AGENTS (Material No. 11-004A) and dry them with filtered 
R  compressed air. 
R  (c) Apply a light coat of COMMON GREASE (Material No. 04-022) to the 
R  washers (2), (3) and (4) and to the shaft (1). 
R  (d) Align the center bores of the upper and lower arms of the torque 
R  links and install the washers (2), (3) and (4). 
R  (e) Install the shaft (1). 
R  (f) Make sure that the play at the torque link hinges is correct 
R  (Ref. TASK 32-21-00-200-003). 
R  (g) Do the torque procedure on the nut (6) 
R  1_  Apply a layer of SPECIAL MATERIALS (Material No. 05-047) to
R  the washer (5) and install it on the shaft (1). 
R  2_  Apply a layer of SPECIAL MATERIALS (Material No. 05-047) to
R  the threads of the nut (6) and install it. 
R  3_  TORQUE the nut (6) to 9 m.daN (66.37 lbf.ft) and loosen the
R  nut (6). Do this three times. 
R  4_  Loosen the nut (6) to get a clearance between 0.02 mm (0.0007
R  in.) and 0.1 mm (0.0039 in.).

 

R  5_  Make sure that you can align a hole of the nut (6) with the
R  slot of the shaft (1) and keep the clearance given above. 
R  If not: 
R  - loosen the nut (6), 
R  - remove the washer (5), 
R  - adjust the thickness of the washer (5) to get the clearance 
R  given above with a hole of the nut (6) aligned with the slot 
R  of the shaft (1), 
R  NOTE : The total thickness of the washer (5) (shoulder____ 
R  included) must not be less than 4 mm (0.1574 in.). If 
R  the thickness of the washer (5) is less than 4 mm 
R  (0.1574 in.), replace it with the new washer (5). 
R  - do a passivating treatment on the reworked surface (Ref. CMM 
R  320901), 
R  - do the torque procedure on the nut (6) again. 
R  6_  Apply a layer of SPECIAL MATERIALS (Material No. 05-047) to
R  the threads of the screw (10). 
R  7_  Install the screw (10), the washer (7), the nut (8) and
R  tighten it. 
R  8_  Install the new cotter pin (9) on the nut (8).
R  (5) Apply a layer of SEALANTS (Material No. 09-001) to the areas 
R  identified E. 
R  (6) Make sure that the lubrication points are clean and in good condition 
R  on the shaft (1). 
R  **ON A/C 001-004, 051-054,
 Subtask 32-21-27-420-055
 C. Install the electrical harnesses
 (Ref. Fig. 401/TASK 32-21-27-991-004)
 (1) Install the protector (91), the washers (92) and (113), the bolt (93)
 and the nut (112). Tighten the nut (112).
 (2) Install the stop (107), the bolts (109), the washers (106) and (108)
 