Main Landing Gear Door Seal Replacement Figure 801/TASK 32-12-11-991-004
1EFF : 1 1R 1CES ALL 1 11 1 32-12-11 Page 804 Nov 01/00
(5) Install the new tip seal (4), the U section (2) and the section (3) with the screws (7), the washers (6) and the nuts (5).
Subtask 32-12-11-020-052
B. Replacement of the Hinge Sealing Strip
(1) Remove the fasteners (Ref. ASRM 514211019) from the U sections (11) and (17).
(2) Remove the U sections (11) and (17).
(3) Remove and discard the sealing strips (10) and (18).
(4) Install in position the new strip sealing (10) and strip sealing (18).
(5) Install the U sections (11) and (17) with rivets (19) (Ref. ASRM 514211007).
(6) Remove the rivets (19) (Ref. ASRM 514211019) from the U sections (12), (13), (14), (15) and (16).
(7) Remove the U sections (12), (13), (14), (15) and (16).
(8) Remove and discard the sealing strip (8).
(9) Install in position the new strip sealing (8).
(10) Install the U sections (12), (13), (14),(15) and (16) with the rivets (19) (Ref. ASRM 514211007) on the door (9).
5. Close-up________
R
Subtask 32-12-11-410-050
R A. Close Access
(1) Close the MLG doors (Ref. TASK 32-12-00-410-001).
R Subtask 32-12-11-865-056
R R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GA, 4GG, 3GG, 1GG, 2GG, 2GA, 1701GK, 1702GK
1EFF : ALL 1 32-12-11Page 805 1 1 Aug 01/04 1 1 1CES 1 1EFF : ALL 1 32-12-11Page 806 1 1 Aug 01/04 1 1 1CES 1 DOOR ASSY - SECONDARY HINGED FAIRING - REMOVAL/INSTALLATION
R Subtask 32-12-11-942-051
R C. Remove Ground Equipment
R (1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
R (2) Remove the warning notice(s).
R (3) Remove the access platform(s).
___________________________________________________________
TASK 32-12-13-000-001
Removal of the Secondary Hinged Fairing
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
No specific warning notice
No specific wedge - non metallic
No specific access platform 2.5 m (8 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(29)