(10)
Install the nut (10). TORQUE the nut (10) to between 0.8 and 0.95 m.daN (70.79 and 84.07 lbf.in).
(11)
Install a new cotter pin (9).
(12)
Remove the TENSIONING FIXTURE (M21929) from the spring (5).
(13)
Apply SEALANTS (Material No. 09-001) at the zones E.
5. Close-up
________ Subtask 32-21-18-410-050
A. Get Access
(1)
Remove the warning notice(s).
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Close the doors of the nose landing gear (Ref. TASK 32-22-00-410-001).
1EFF : ALL 1 32-21-18Page 415 1 1 Feb 01/98 1 1 1CES 1
BEARING ASSY - SWIVEL - REMOVAL/INSTALLATION
____________________________________________ TASK 32-21-24-000-001 Removal of the Swivel Bearing WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.7 m (5 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-26-42-000-001 Removal of the Avionics Equipment Ventilation Duct 32-21-11-000-002 Removal of the NLG Leg Assy (2526GM) R 32-21-24-991-001-A Fig. 401
1EFF : ALL 1 32-21-24Page 401 1 1 Nov 01/02 1 1 1CES 1
3. Job Set-up
__________
Subtask 32-21-24-010-050
A. Get Access
(1)
Remove the nose landing gear (Ref. TASK 32-21-11-000-002).
(2)
Open the access door 824 to get access to the hinge points of the nose gear.
(3)
Put the access platform in position in zone 123.
(4)
Remove the avionics equipment ventilation duct (Ref. TASK 21-26-42-000-001).
4. Procedure
_________ R (Ref. Fig. 401/TASK 32-21-24-991-001-A) Subtask 32-21-24-020-052
A. Removal of the Swivel Bearing
(1)
Remove the cotter pins (7), the nuts (8), the washers (6), the protective cover (5) and the seals (3) and (4).
(2)
Remove the bolts (1).
(3)
Remove the swivel bearing (2).
1EFF : ALL 1 32-21-24Page 402 1 1 Nov 01/02 1 1 1CES 1
R R Nose Gear Swivel Bearing Figure 401/TASK 32-21-24-991-001-A
1EFF : 1 1 1CES ALL 1 111 32-21-24 Page 403 Nov 01/02
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(104)