• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 (d) Remove the bush (11).
 (6)
 At the position F:

 (a)
 Remove and discard the cotter pin (12).

 (b)
 Remove the nut (14) and the washer (15).

 (c)
 Remove the bolt (18).

 (d)
 Remove the bush (17).

 

 (7)
 Hold the fixed fairing (1).

 (8)
 At the positions B, D and E, remove the bolts (7) and the bushes (6). Remove the fixed fairing (1).


 **ON A/C 301-399,
 Subtask 32-12-14-020-050-B
 A. Removal of the MLG Fixed Fairing Assembly
 WARNING : THE WEIGHT OF THE FIXED FAIRING IS 34kg (75lb).

_______
 NOTE : Do not move the locknuts (3) and (11) or you will cause the fixed

____
 fairing (1) to go out of adjustment.

 (1)
 If a new fixed fairing (1) is necessary, remove the hinge 1A extension fairing (2) (Ref. TASK 57-55-11-000-006).

 (2)
 Remove the screws (20) and remove the cover plates (21).

 (3)
 Hold the head of the screw (22) and remove the nut (10) to release the bonding strap (9) from the fixed fairing (1).

 (4)
 Remove and discard the cotter pins (5).

 (5)
 Remove the nuts (4) and the washers (6) from the bolts (8).

 (6)
 At the position C:

 (a)
 Remove and discard the cotter pin (13).

 (b)
 Remove the nut (14) and the washer (15).

 


 1EFF : 001-049, 051-060, 101-101, 301-399, 1 32-12-14Page 407 1 1 Aug 01/05R 1 1 1CES 1


 (c)
 Remove the bolt (19).

 (d)
 Remove the bush (16).


 (7)
 At the position F:

 (a)
 Remove and discard the cotter pin (12).

 (b)
 Remove the nut (14) and the washer (15).

 (c)
 Remove the bolt (19).

 (d)
 Remove the bush (18).

 

 (8)
 Hold the fixed fairing (1).


 (9) Remove the bolts (8) and the bushes (7). Remove the fixed fairing (1). R **ON A/C 051-099, 102-149, 151-199, 201-299, 401-499,
 Post SB 52-1100 For A/C 051-060,
 Subtask 32-12-14-020-050-A

 A. Removal of the MLG Fixed Fairing Assembly
 WARNING : THE WEIGHT OF THE FIXED FAIRING IS 34kg (75lb).

_______
 NOTE : Do not move the locknuts (2) and (10) or you will cause the fixed

____
 fairing (1) to go out of adjustment.

 (1)
 Remove the screws (19) and remove the cover plates (20).

 (2)
 Hold the head of the screw (21) and remove the nut (9) to release the bonding strap (8) from the fixed fairing (1).

 (3)
 Remove and discard the cotter pins (4).

 (4)
 Remove the nuts (3) and the washers (5) from the bolts (7).

 (5)
 At the position C:

 (a)
 Remove and discard the cotter pin (12).

 (b)
 Remove the nut (13) and the washer (14).

 


R 1EFF : 051-099, 102-149, 151-199, 201-299, 1 32-12-14Page 408 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 (c)
 Remove the bolt (18).

 (d)
 Remove the bush (15).


 (6)
 At the position F:

 (a)
 Remove and discard the cotter pin (11).

 (b)
 Remove the nut (13) and the washer (14).

 (c)
 Remove the bolt (18).

 (d)
 Remove the bush (17).

 

 (7)
 Hold the fixed fairing (1).

 (8)
 Remove the bolts (7) and the bushes (6). Remove the fixed fairing (1).


R 1EFF : 051-099, 102-149, 151-199, 201-299, 1 32-12-14Page 409 1401-499, 1Aug 01/05 1 1 1CES 1

 **ON A/C ALL


 TASK 32-12-14-400-001
 Installation of the MLG Fixed Fairing Assembly (That was Removed For Access Only)
 WARNING : DO NOT WALK ON A CLOSED LANDING GEAR DOOR.
_______
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific safety barriers
 No specific warning notice
 No specific access platform 3 m (9 ft. 10 in.)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(37)