R  4_ Safety the cable end (6) in position with a cable-tie. 
 (2) Make sure that a GROUND LOCK SLEEVE is installed on the applicable MLG door actuating cylinder (Ref. TASK 32-00-00-481-002). 
 (3) Disconnect the applicable MLG door actuating cylinder from the MLG door (Ref. TASK 32-31-35-000-001).  
R R  (4) Hold the body of the door actuating cylinder to prevent damage caused by small movement of the ram.  
R  (5) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001). 
 (6) If the free-fall system was used to open the MLG doors, reset the free-fall system (Ref. TASK 32-33-00-720-001). 
 (7) Make sure that the by-pass valve operating lever is in the normal position as follows:  
R R  (a) Put the RIGGING PIN (98DNSA20208040) through the operating lever and the by-pass valve rigging pin holes.  
R R R  (b) If RIGGING PIN installation is not possible (because the operating lever and the by-pass valve rigging pin holes are not aligned), do the steps that follow:  
R R R  1_  Remove the safety clip(s) and the tag(s) and close this(these)circuit breaker(s): 1GA, 52GA.  
R R  2_  Manually move the operating lever until the lever and theby-pass valve rigging pin holes are aligned.  
R R  3_  Put the RIGGING PIN through the operating lever and theby-pass valve rigging pin holes.  
R R  4_  Open, safety and tag this(these) circuit breaker(s):1GA, 52GA.  
R R  (c) Remove the RIGGING PIN and safety the operating lever in the rigged position with MISCELLANEOUS (Material No. 19-010) through the rigging pin holes.  
R  (8) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001). 
 (9) On the panel 110VU, turn the GRAVITY GEAR EXTN handle clockwise two full turns.
 (10) Connect the applicable MLG door actuating cylinder (Ref. TASK 32-31-35-400-001). 
 (11) Remove the GROUND LOCK SLEEVE from the MLG door actuating cylinders.  
R  (12) Pressurize the Green hydraulic system (Ref. TASK 29-10-00-863-001). 
 (13) Close the MLG doors as follows:  
R R R  (a) Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GA, 52GA.  
R  (b) On the panel 110VU, turn the GRAVITY GEAR EXTN handle counterclockwise two full turns at a rate of one full turn every 5 seconds.  
R  (c) Fold the GRAVITY GEAR EXTN handle into the center console. 
 (14) Put the MLG door ground-control handle in the CLOSED position. 
 (15) Make sure that the MLG doors are closed and locked correctly. 
 WARNING : IF THE MLG DOOR CONTROLS DO NOT AGREE WITH THE POSITION OF_______ THE MLG DOORS, YOU MUST KEEP CLEAR OF THE LANDING GEAR BAY UNTIL: - YOU DEPRESSURIZE THE GREEN HYDRAULIC SYSTEM - YOU INSTALL A GROUND LOCK SLEEVE ON THE ACTUATING CYLINDER OF THE APPLICABLE OPEN DOOR(S). IF THE DOOR IS OPEN AND NOT SAFETIED, THERE IS A RISK THAT IT CAN CLOSE AND CAUSE INJURY.  
R  (16) Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001). 
 5. Close-up________ 
 Subtask 32-12-00-410-055 
 A. Close Access 
 (1) Make sure that the work area is clean and clear of tool(s) and other items. 
 (2) Close the applicable access panel(s): 
 FOR 2804GM - close 195BB
 FOR 2805GM - close 196BB. 
 Subtask 32-12-00-865-073  
R R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2GA, 1701GK, 1702GK. 
 Subtask 32-12-00-860-072 
 C. Aircraft Maintenance Configuration 
 (1) Connect the isolation coupling of the PTU (Ref. TASK 29-23-00-860-002). 
 Subtask 32-12-00-942-065  
R  D. Removal of Equipment  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(12)