NOTE : Apply a layer of SPECIAL MATERIALS (Material No. 05-047) to the
____ threads of all the nuts and bolts before you install them.
(1) Hold the lower harness (23) in position and:
(a)
Install the electrical connectors (18) in the axle.
(b)
Install the casing (19). Install the screw (9) and the washer (8). Install the washer (20) and the nut (21).
(c)
Safety the nut (21) with the new cotter pin (22).
(d)
Connect the electrical connector (7) with the counterplate (6) and the screws (1).
(e)
Install the clamp (4) and the screw (5).
(f)
Install the washer (3) and the nut (2).
(g)
Connect the electrical connectors (18) to the electrical plugs on the support (13).
(h)
Install the support (13).
(i)
Install the bolts (17), the washers (16) and the nuts (15).
(j)
Safety the nuts (15) with the new cotter pins (14).
R 1EFF : 001-004, 051-099, 1 32-21-43Page 411 1 1 May 01/05 1 1 1CES 1
(k) Install the cover (10).
(l) Install the screws (11) and the washers (12).
(m) Tighten the screws (11) and safety them with the lockwire
corrosion resistant steel dia. 0.8 mm (0.032 in).
R **ON A/C 051-099,
R Subtask 32-21-43-420-051-A
R A. Installation of the Lower Harness (A/C with TPIS)
R NOTE : Remove the blanking caps from the electrical connectors____
R immediately before you connect them.
R NOTE : Apply a layer of SPECIAL MATERIALS (Material No. 05-047) to the____
R threads of all the nuts and bolts before you install them.
R (1) Hold the lower harness (16) in position and:
R (a) Install the electrical connectors (11) in the axle.
R (b) Install the casing (12). Install the screw (9) and the washer
R (8). Install the washer (13) and the nut (14).
R (c) Safety the nut (14) with the new cotter pin (15).
R (d) Connect the electrical connector (7) with the counterplate (6)
R and the screw (1).
R (e) Install the clamp (4) and the screw (5).
R (f) Install the washer (3) and the nut (2).
R (g) Install the rotating mechanism (10) (Ref. TASK 32-49-17-400-001).
R **ON A/C 001-004, 051-099,
Subtask 32-21-43-865-055
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
R 1GV.
R 1EFF : 001-004, 051-099, 1 32-21-43Page 412 1 1 May 01/05 1 1 1CES 1
R **ON A/C 001-004,
Subtask 32-21-43-710-058
C. Test
(1) Do the operational test of the nose wheel steering (Ref. TASK 32-51-00-710-001).
R **ON A/C 051-099,
R Subtask 32-21-43-710-058-A
R C. Test
R R (1) Do the operational test of the nose wheel steering (Ref. TASK 32-51-00-710-001).
R R (2) Do the operational test of the tire pressure indicating system (Ref. TASK 32-49-00-710-001).
R **ON A/C 001-004, 051-099,
5. Close-up________
Subtask 32-21-43-942-051
A. Removal of Equipment
(1) Remove the warning notice(s).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R 1EFF : 001-004, 051-099, 1 32-21-43Page 413 1 1 May 01/05 1 1 1CES 1 **ON A/C ALL
TASK 32-21-43-000-002 Removal of the NLG Electrical Harness 1M WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific adjustable access platform
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(121)