• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -seal the fixed assemblies
 -
the heads of bolts and nuts

 -
the fixed elements that form an angle.


 1EFF : ALL 1 32-21-00Page 711 1 1 May 01/05 1 1 1CES 1 Subtask 32-21-00-916-051


 1_ Mix the SEALANTS (Material No. 09-002) : 75 g (0.165 lb) of
 compound with 10 g (0.022 lb) of activator.
 2_ Paint all the parts that it is necessary to paint, then apply
 this mixture with a spatula or a caulking gun.
 NOTE : Only apply layers 1 mm (0.039 in) thick____
 3_ Let the parts dry for 30 to 40 hours
 NOTE : You can keep the material as it is or you can apply a____
 finishing coat of paint that dries at the ambient
 temperature.
 5. Close-up________

 A. Removal of the protective coverings
 (1)
 Remove the protective coverings. Subtask 32-21-00-942-050

 B. Removal of Equipment

 (1)
 Remove the access platform. Subtask 32-21-00-410-050

 C. Close Access

 (1)
 Close the NLG doors (Ref. TASK 32-22-00-410-001). Subtask 32-21-00-942-051


 D. Safety Precautions
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Make sure that the work area is clean and clear of tool(s) and other items.


 1EFF : ALL 1 32-21-00Page 712 1 1 May 01/05 1 1 1CES 1 LEG ASSY - NLG (2526GM) - REMOVAL/INSTALLATION


______________________________________________
 TASK 32-21-11-000-002
 Removal of the NLG Leg Assy (2526GM)
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
 OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.

 WARNING : PRESSURIZE ONLY THE HYDRAULIC SYSTEM(S) THAT IS (ARE) NECESSARY FOR
_______ THE TASK. ISOLATE THE OTHER HYDRAULIC SYSTEM(S) BEFORE YOU SUPPLY HYDRAULIC POWER TO THE AIRCRAFT.
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific blanking plugs
 No specific block
 No specific circuit breaker(s) safety clip(s)
 No specific cord

R  No specific mini-hoist with a load capacity of 300 daN (675 lbf) No specific safety barriers No specific spatula No specific warning notice(s) No specific access platform 2.06 m (6 ft. 9 in.) No specific container 5 l (1.3208 USgal) J47555 1 EXTRACTOR J47556 1 EXTRACTOR J47558 1 EXTRACTOR M21929 2 TENSIONING FIXTURE 98D32203500000 1 TOOL - R/I NLG
 1EFF : ALL 1 32-21-11Page 401 1 1 May 01/01 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------


98D32203504000 1 TROLLEY-NLG GROUND HANDLING
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
07-11-00-581-001 29-00-00-864-001
29-14-00-614-001

R 32-00-00-860-001
R 32-21-41-000-001 32-22-00-010-001 32-22-13-000-001 32-22-15-000-001 32-41-12-000-001 32-51-15-000-001 33-43-11-000-001 33-46-11-000-001 33-46-12-000-001 32-21-11-991-008 32-21-11-991-009 32-21-11-991-010 32-21-11-991-011 32-21-11-991-012 32-21-11-991-013-A Lifting for Aircraft Maintenance OperationsPut the Related Hydraulic System in the Depressurized Configuration before Maintenance ActionDepressurization of the Hydraulic Reservoirs Flight Configuration Precautions with Electrical PowerRemoval of the NLG TOWING attachment (2701GM)Nose Gear Doors - Ground Doors OpeningRemoval of the Aft Door AssyRemoval of the Leg Door AssyRemoval of the NLG Wheel (2659GM,2660GM)Removal of the Swivel Selector ValveRemoval of the Runway Turnoff Light (3LC1, 3LC2)Removal of the Take Off Light (7LR)Removal of the Taxi Light (8LR)Fig. 401Fig. 402Fig. 403Fig. 404Fig. 405Fig. 406
 1EFF : ALL 1 32-21-11Page 402 1 1 May 01/05 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 32-21-11-941-055
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架3(70)