Ram Air Turbine
Figure 301/TASK 12-13-29-991-001
R 1EFF : 062-099, 106-149, 151-199, 204-299, 1 12-13-29Page 304 1301-399, 401-499, 1Aug 01/05 1 1 1CES 1
APU ((GTCP 36-300)) - SERVICING
_______________________________
TASK 12-13-49-612-001 Check APU Oil Level and Replenish
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-90-00-600-001 Check Oil Level and Replenish (GTCP 36-300) 49-90-00-600-004 Check Oil Level and Replenish (APS 3200) 49-90-00-600-007 Check and Replenish Oil Level (131-9(A))
3. Job Set-up
__________ Subtask 12-13-49-860-054
A. Not applicable
4. Procedure
_________ Subtask 12-13-49-612-050
A. Oil Service for
-GTCP 36-300 APU
(Ref. TASK 49-90-00-600-001)
-APS 3200 APU
(Ref. TASK 49-90-00-600-004)
-131-9(A) APU
(Ref. TASK 49-90-00-600-007).
ENGINE OIL - SERVICING
______________________
TASK 12-13-79-610-002
Check oil level and replenish Check Pop Out Indicator of EMCD (Electrical Master Chip Detector) WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER ENGINE
_______ OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM OF 5 MINUTES AFTER THE ENGINE SHUTDOWN. IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK THE OIL CAN BURN YOU DANGEROUSLY.
1.
Reason for the Job
__________________
Refer to the MPD TASK: 791000-C3
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific lint-free cloth No specific warning notice R 23699-525SM25 1 VIS PROBE ON SITE TEST KIT
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP2442 *
engine oil Ref. SB CFM 79-001 (Ref. 70-30-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
73-11-20-000-002 Removal of the Servo Fuel Heater 73-11-20-400-002 Installation of the Servo Fuel Heater 79-00-00-281-002 Check of the Electrical Master Chip Detector for
Particles 79-11-10-300-003 Replacement of the O-ring of the Oil Tank Filler Cap 79-21-20-000-002 Removal of the Main Oil/Fuel Heat Exchanger 79-21-20-400-002 Installation of the Main Oil/Fuel Heat Exchanger
**ON A/C 001-049, 051-061, 101-105, 151-151, 201-203,
12-13-79-991-300 Fig. 301 R **ON A/C 062-099, 106-149, 152-199, 204-299, 301-399, 401-499,
12-13-79-991-300-A Fig. 301A
**ON A/C ALL
12-13-79-991-301 Fig. 302
12-13-79-991-305 Fig. 303
3. Job Set-up
__________
Subtask 12-13-79-941-068
A. Safety Precautions
(1)
On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2)
Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3)
On the overhead maintenance panel 50VU:
(a)
Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b)
Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 12-13-79-010-065
B. Open the oil tank servicing access door :
FOR 1000EM1
437BL
FOR 1000EM2
447BL
4. Procedure
_________
**ON A/C 001-049, 051-061, 101-105, 151-151, 201-203,
(Ref. Fig. 301/TASK 12-13-79-991-300) R **ON A/C 062-099, 106-149, 152-199, 204-299, 301-399, 401-499,
(Ref. Fig. 301A/TASK 12-13-79-991-300-A)
**ON A/C ALL
(Ref. Fig. 302/TASK 12-13-79-991-301, 303/TASK 12-13-79-991-305)
Subtask 12-13-79-210-065
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 1(81)