 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 38-31-00-680-001 Draining of the Toilet System 12-16-38-991-001 Fig. 301
 3. Job Set-up
__________
 Subtask 12-16-38-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 12-16-38-680-051
 B. You must drain the waste holding tank when the outside air temperature is as shown in the table (Ref. TASK 38-31-00-680-001).
 Table 1 - Waste-Holding-Tank Drain Configuration
 1EFF : ALL 1 12-16-38Page 302 1 1 Aug 01/01R 1 1 1CES 1


 ------------------------------------------------------------------------------
R  | Configuration | | | 
R  |---------------------------------------------------| Exposure | Waste | 
R  | Air | Cabin | Outside air | time | holding | 
R  |conditioning|temperature| temperature | | tank drain| 
R  |------------|-----------|--------------------------|------------|-----------| 
R  | | | Between 0 and -15DEG.C | | Not | 
R  | ON | Above | 32 and 5DEG.F | Any | required | 
R  | | 10DEG.C |--------------------------|------------|-----------| 
R  | | | Below -15DEG.C | | | 
R  | | 50DEG.F | 5DEG.F | 1 h 15 min | | 
R  |------------|-----------|--------------------------|------------| | 
R  | | | Between 0 and -7DEG.C | | | 
R  | | | 32 and 19.4DEG.F | 1 h 30 min | Required | 
R  | | |--------------------------|------------| | 
R  | OFF | | Between -7 and -15DEG.C | | | 
R  | | | 19.4 and 5DEG.F | 0 h 30 min | | 
R  | | |--------------------------|------------| | 
R  | | | Below -15DEG.C | | | 
R  | | | 5DEG.F | Any | | 
R  |----------------------------------------------------------------------------| 
R  | After you have drained the waste holding tank, you must refill it with warm| 
R  | disinfectant at 30DEG.C (86DEG.F) 30 minutes before you start the engines. |
 ------------------------------------------------------------------------------
Subtask 12-16-38-010-050
 C. Get Access 
R  (1) Put the ACCESS PLATFORM 2M (6 FT) in position. 
R  (2) Put the CART - SERVICING, TOILET in position.
 (3) Open the access door 172AR.
 4. Procedure_________
 Subtask 12-16-38-680-050
 A. Draining of the System
 (Ref. Fig. 301/TASK 12-16-38-991-001)
 CAUTION : MAKE SURE THAT THE VACUUM PRESSURE IS NOT MORE THAN 6 PSI (0,4_______
 BAR) MAXIMUM, IF YOU USE A VACUUM OPERATED TOILET SERVICE
 VEHICLE. A HIGHER VACUUM PRESSURE CAN CAUSE DAMAGE TO THE
 VACUUM TOILET SYSTEM.

 

 Service Panel - Location
 Figure 301/TASK 12-16-38-991-001
 1EFF :  ALL  1  12-16-38 Page 304 
1  1  Feb 01/98
 1  1
 1CES  1

 

 (1) Open the cap of the toilet drain connection and the fill and rinse connection.
 (2) Connect the toilet service-vehicle hose-adapter and the 4-inch diameter drain hose to the toilet drain connection.
 (3) Push the PUSH TO OPEN lever (1).
 (4) Move the drain valve control-handle 3341MM from the CLOSE to the OPEN position.
 NOTE : The waste will drain.____
 Subtask 12-16-38-170-050
 B. Flushing of the Toilet System
 (1) Connect the flush/fill hose (1-inch diameter) of the toilet service vehicle to the fill and rinse connection.
 (2) Operate the toilet service vehicle. 
R R  (3) make sure that the water pressure is stable at 2.4 bar (34.81 psi) and the water flow is stable at 38.0 l (10.04 USgal) per minute. 
R R  (4) Flush the toilet system with approximately 57.0 l (15.06 USgal) of water.
 NOTE : This will take approximately 90 s.____
 NOTE : The drain valve must be in the OPEN position.____
 (5) Touch the drain hose and make sure that the fluid has drained completely.
 (6) Switch off the toilet service vehicle.
 (7) Push the drain valve control-handle 3341M to the CLOSE position.
 Subtask 12-16-38-613-051
 C. Disinfection of the Waste Holding Tank (Ref. Fig. 301/TASK 12-16-38-991-001)
 