_______
AN EXTENDED MLI.
CAUTION : DO NOT LET THE MLI's FALL FREELY.
_______
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific safety barriers
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-11-28-650-001 General Refuel/Defuel Safety Procedures 12-11-28-650-002 Refuel/Defuel Safety Procedures for use in the Hangar 12-11-28-860-001 Procedure to use the ADIRU to Find the Pitch and Roll
Data
12-11-28-860-002 Procedure to use the FQIC Input Parameters to Find the Pitch and Roll Data
12-32-28-281-001 Drain Water Content
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
12-11-28-991-009 Fig. 306
**ON A/C 301-399,
12-11-28-991-009-A Fig. 306A
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-213,
12-11-28-991-011 Fig. 307
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
12-11-28-991-012 Fig. 308
**ON A/C 301-399,
12-11-28-991-012-A Fig. 308A
**ON A/C ALL
12-11-28-991-024 Fig. 309
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
12-11-28-991-014 Fig. 310
12-11-28-991-025 Fig. 311
12-11-28-991-015 Fig. 312
12-11-28-991-026 Fig. 313
12-11-28-991-036 Fig. 314
12-11-28-991-016 Fig. 315
12-11-28-991-027 Fig. 316
12-11-28-991-017 Fig. 317
12-11-28-991-028 Fig. 318
12-11-28-991-037 Fig. 319
12-11-28-991-018 Fig. 320
12-11-28-991-029 Fig. 321
12-11-28-991-019 Fig. 322
12-11-28-991-030 Fig. 323
12-11-28-991-038 Fig. 324
12-11-28-991-020 Fig. 325
12-11-28-991-031 Fig. 326
12-11-28-991-034 Fig. 327
12-11-28-991-035 Fig. 328
12-11-28-991-039 Fig. 329
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C ALL
12-11-28-991-021 12-11-28-991-032 12-11-28-991-022 12-11-28-991-033
**ON A/C 301-399,
12-11-28-991-055 12-11-28-991-056 12-11-28-991-057 12-11-28-991-058 12-11-28-991-059 12-11-28-991-040 12-11-28-991-044 12-11-28-991-060 12-11-28-991-061 12-11-28-991-062 12-11-28-991-063 12-11-28-991-064 12-11-28-991-041 12-11-28-991-045 12-11-28-991-065 12-11-28-991-066 12-11-28-991-067 12-11-28-991-068 12-11-28-991-069 12-11-28-991-042 12-11-28-991-046 12-11-28-991-070 12-11-28-991-071 12-11-28-991-072 12-11-28-991-073 12-11-28-991-074 12-11-28-991-043 12-11-28-991-047 Fig. 330Fig. 331Fig. 332Fig. 333
Fig. 334Fig. 335Fig. 336Fig. 337Fig. 338Fig. 339Fig. 340Fig. 341Fig. 342Fig. 343Fig. 344Fig. 345Fig. 346Fig. 347Fig. 348Fig. 349Fig. 350Fig. 351Fig. 352Fig. 353Fig. 354Fig. 355Fig. 356Fig. 357Fig. 358Fig. 359Fig. 360Fig. 361
R 1EFF : ALL 1 12-11-28Page 368 1 1 May 01/05 1 1 1CES 1
**ON A/C ALL
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
(Ref. Fig. 306/TASK 12-11-28-991-009)
**ON A/C 301-399,
(Ref. Fig. 306A/TASK 12-11-28-991-009-A)
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-213,
(Ref. Fig. 307/TASK 12-11-28-991-011)
**ON A/C ALL
Subtask 12-11-28-941-058
A. Safety Precautions
(1) You must obey the refuel/defuel safety precautions (Ref. TASK 12-11-28-650-001) (Ref. TASK 12-11-28-650-002).
(2) Put the safety barriers in position.
Subtask 12-11-28-281-050
B. Fuel Sampling
(1) Get a fuel sample from the aircraft (Ref. TASK 12-32-28-281-001) and measure its Specific Gravity (SG).
Subtask 12-11-28-010-058
C. Get Access
(1)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 1(37)