• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-12 09:11来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -
install the FMGC 2 (1CA2) (Ref. TASK 22-83-34-400-001)

 -
install the FCDC 2 (3CE2) (Ref. TASK 27-95-34-400-001)

 -
install the SEC 2 (1CE2) (Ref. TASK 27-94-34-400-001)

 -
install the ELAC 2 (2CE2) (Ref. TASK 27-93-34-400-001).

 

 (e)
 On the shelf 85VU:

 -
install the SFCC 1 (21CV) (Ref. TASK 27-51-34-400-001)

 -
install the EIU1 (1KS1) (Ref. TASK 73-25-34-400-040)

 -
install the DMC 1 and the DMC 3 (1WT1, 1WT3) (Ref. TASK 31-63-34-400-001)

 -
install the FWC 1 (1WW1) (Ref. TASK 31-53-34-400-001)

 -
install the SDAC 1 (1WV1) (Ref. TASK 31-55-34-400-001).

 

 (f)
 On the shelf 86VU:

 -
install the SDAC 2 (1WV2) (Ref. TASK 31-55-34-400-001)

 -
install the FWC 2 (1WW2) (Ref. TASK 31-53-34-400-001)

 -
install the DMC 2 (1WT2) (Ref. TASK 31-63-34-400-001)

 -
install the EIU 2 (1KS2) (Ref. TASK 73-25-34-400-040)

 -
install the EVMU (2EV) (Ref. TASK 77-32-34-400-040)

 -
install the SFCC 2 (22CV) (Ref. TASK 27-51-34-400-001).

 


R 1EFF : 106-149, 303-399, 401-499, 1 12-21-13Page 720 1 1 Aug 01/05 1 1 1CES 1


 (g)
 On the shelf 87VU:

 -
install the FDIU (2TU) (Ref. TASK 31-33-34-400-001)

 -
install the QAR (3TU) (Ref. TASK 31-33-52-400-001), if removed

 -
install the DMU (1TV) (Ref. TASK 31-36-34-400-001), if removed

 -
install the CFDIU (1TW) (Ref. TASK 31-32-34-400-001)

 -
install the CIDS Director 1 (101RH) (Ref. TASK 23-73-34-400-001)

 -
install the DAR (2TV) (Ref. TASK 31-36-52-400-001), if removed.

 

 (h)
 On the shelf 88VU:

 -
install the CIDS Director 2 (102RH) (Ref. TASK 23-73-34-400-001)

 -
install the AEVC (10HQ) (Ref. TASK 21-26-34-400-001)

 -
install the GPWC (1WZ) (Ref. TASK 34-48-34-400-001), if removed

 -
install the Announce/Music reproducer (10RX) (Ref. TASK 23-32-34-400-001), if removed.

 

 (i)
 Install the ADIRU 1, the ADIRU 2 and the ADIRU 3 (1FP1, 1FP2, 1FP3) (Ref. TASK 34-12-34-400-001).

 (j)
 On the shelf 91VU:

 -
install the GCU1 and the GCU2 (1XU1, 1XU2) (Ref. TASK 24-22-34-400-001)

 -
install the APU GCU (1XS) (Ref. TASK 24-23-34-400-001).

 

 (k)
 On the shelf 92VU:

 -
install the FLSCU 1 and the FLSCU 2 (7QJ, 9QJ) (Ref. TASK 28-46-34-400-001)

 -
install the FQIC (3QT) (Ref. TASK 28-42-34-400-001)

 -
install the GPCU (1XG) (Ref. TASK 24-41-34-400-001).

 

 (l)
 On the shelf 93VU:

 -
install the SEC 3 (1CE3) (Ref. TASK 27-94-34-400-001)

 -
install the LGCIU 1 (5GA1) (Ref. TASK 32-31-71-400-001).

 

 (m)
 On the shelf 94VU:

 -
install the LGCIU 2 (5GA2) (Ref. TASK 32-31-71-400-001)

 -
install the SDCU (10WQ) (Ref. TASK 26-17-34-400-001)

 -
install the BSCU (10GG) (Ref. TASK 32-42-34-400-001)

 -
install the TIPS detection unit (2GV) (Ref. TASK 32-49-34-400-001), if removed.

 

 (n)
 On the shelf 95VU:

 -
install the ILS Receiver 1 (2RT1) (Ref. TASK 34-36-31-400-001) or the Multi Mode Receiver 1 (40RT1) (Ref. TASK 34-36-31-400-002).

 -
install the EGIU 1 (22XU1) (Ref. TASK 24-22-33-400-002)

 


R 1EFF : 106-149, 303-399, 401-499, 1 12-21-13Page 721 1 1 Aug 01/05 1 1 1CES 1


R  - install the BMC 1 (Ref. TASK 36-11-34-400-001) 
R  - install the cabin pressure controller 1 (11HL) (Ref. TASK 21-
R  31-34-400-001) 
R  - install the pack 1 temperature controller (47HH) (Ref. TASK 21-
R  61-34-400-002) 
R  - install the FWD cargo heat controller (1HC) (Ref. TASK 21-43-
R  34-400-001), if removed. 
R  (o) On the shelf 96VU: 
R  - install the Pack 2 temperature controller (57HH) (Ref. TASK 21-
R  61-34-400-002) 
R  - install the cabin pressure controller 2 (12HL) (Ref. TASK 21-
R  31-34-400-001) 
R  - install the BMC 2 (1HA2) (Ref. TASK 36-11-34-400-001) 
R  - install the AFT cargo heat controller (10HC) (Ref. TASK 21-43-
R  34-400-002), if removed 
R  - install the EGIU 2 (22XU2) (Ref. TASK 24-22-33-400-002) 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 1(146)