19.46 lbf.in).
1EFF : ALL 1 12-12-32Page 340 1 1 May 01/04R 1 1 1CES 1
(26)
TORQUE the cap assembly (7) to between 0.57 and 0.67 m.daN (50.44 and
59.29 lbf.in).
(27)
Safety the items that follow with lockwire, corrosion resistant steel 0.8mm (0.032in.) dia.:
-
the bleed screw (1) to the piston assembly (3)
-
the cap assembly (6) to the adjacent bolt (5).
(28)
Apply SEALANTS (Material No. 09-016) to the items that follow:
-bleed screw (1)
-
the bleed plug (2)
-
the bleed plug housing (8).
5. Close-up
________ Subtask 12-12-32-942-066
A. Removal of Equipment
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the safety barriers.
(3)
Remove the warning notice(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
OIL - DESCRIPTION AND OPERATION
_______________________________
1. General
_______ This section provides instructions related to oil replenishing of the engine and the accessories such as the IDG, the pneumatic starter etc...
ELECTRICAL POWER - SERVICING
____________________________ TASK 12-13-24-680-040 R Draining of the Oil from the IDG WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
_______ THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE HOUR.
WARNING : WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.
_______
HOT OIL CAN BURN YOUR EYES AND SKIN.
IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.
CAUTION : DO NOT OPERATE THE IDG:
_______
-
IF IT CONTAINS TOO MUCH OIL
-
IF IT DOES NOT CONTAIN ENOUGH OIL
IF YOU DO, YOU CAN CAUSE DAMAGE TO THE IDG.
CAUTION : DO NOT DO THE SERVICING OF A DISCONNECTED IDG. CONTINUED OPERATION OF
_______
A DEFECTIVE IDG CAN CAUSE DAMAGE.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container 5.7 l (1.5 USgal)
No specific warning notice
No specific Torque Wrench : range 36.00 to 220.00 lbf.in
(0.40 to 2.60 m.daN)
DH13PM 1 TANK - ENGINE OIL FILLING UP
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. CP8001 *
Lockwire (Ref. 70-30-00)
Material No. 03-002 GB DEF-STAN 91-101
LUBRICATING OIL TURBINE ENGINE SYNT BASE
(Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
2 O-ring 24-21-51 02 -020 2 O-ring 24-21-51 02A-020
R 2 O-ring 24-21-51 02D-020
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-13-24-612-041 IDG Servicing - Filling of the IDG with Oil or
Addition of Oil after a Level Check 12-32-24-281-001 Sampling of the IDG Oil for Analysis 24-21-00-612-043 Servicing of the IDG after Oil Chemical Contamination 24-42-00-861-001 Energize the Ground Service Network from the External
Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
71-13-00-010-040 Opening of the Fan Cowl Doors
71-13-00-410-040 Closing of the Fan Cowl Doors
78-30-00-081-041 Make the Thrust Reverser Serviceable after
Maintenance
78-30-00-481-041 Make the Thrust Reverser Unserviceable for
Maintenance