• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-12 09:11来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  A. Oil Replenishment of the Flap PCU Gearbox
 (1) Put a container below the flap PCU.
 (2) Remove the oil-fill plug (1).
 (3) Remove and discard the packing (2). 
R R R  (4) Slowly add OILS (Material No. 03-003) to the flap PCU gearbox while measuring the quantity of oil being added. Immediately stop adding oil when the oil starts to come out of the oil-fill hole. 
R R R R R R R R R  NOTE : Record the quantity of oil added to the PCU gearbox. If:____ - less than 50 cm3 (3.05 in.3) of oil was added, no maintenance action is necessary - between 50 cm3 (3.05 in.3) and 70 cm3 (4.27 in.3) of oil was added, replace the PCU at (or before) the next scheduled A-Check. Contact AIRBUS for advice - more than 70 cm3 (4.27 in.3) of oil was added, replace the PCU before 20 flight cycles have been completed. Contact AIRBUS for advice.
 (5) Clean the oil-fill plug (1) with a clean lint-free cloth.
 (6) Lubricate the new packing (2) with OILS (Material No. 03-003).
 (7) Install the new packing (2) on the oil-fill plug (1).
 (8) Install the oil-fill plug (1) and TORQUE it to between 2.0 and 2.5 m.daN (14.74 and 18.43 lbf.ft).

 

 (9) Remove the unwanted oil from near the oil-fill plug (1) with a clean cloth.
 (10)
 Examine the packing (2) for signs of an oil leak.

 (11)
 Remove the container.


 5. Close-up
________ Subtask 12-13-27-410-053
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Close the main gear door (RH) (Ref. TASK 32-12-00-410-001). Subtask 12-13-27-865-054
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 6CV, 8CV.
 Subtask 12-13-27-942-055
 C. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 12-13-27Page 311 1 1 Nov 01/04R 1 1 1CES 1

 TASK 12-13-27-612-003


 Oil Replenishment of the Slat PCU (6001CM) Gearbox
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 278451-01
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific lint-free cloth
 No specific safety barriers
 No specific warning notice
 No specific container 1 l (0.2641 USgal)
 No specific Torque Wrench : range 0.20 to 3.60 m.daN

 (2.00 to 26.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R Material No. 03-003  USA MIL-PRF-7808 LUBRICATING OIL TURBINE SYNTHETIC BASE (Ref. 20-31-00)

R C. Expendable Parts


R R R  -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
R  2  packing  27-84-51 01 -250 
R  D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-10-00-864-001 29-10-00-864-002 32-12-00-010-001 32-12-00-410-001 12-13-27-991-003  Depressurize the Green Hydraulic SystemDepressurize the Yellow Hydraulic SystemOpen the Main Gear Doors for AccessClose the Main Gear Doors after AccessFig. 303
 3. Job Set-up__________
 (Ref. Fig. 303/TASK 12-13-27-991-003)
 Subtask 12-13-27-941-054
 A. Safety Precautions
 (1) Put the safety barriers in position.
 (2) On the panel 400VU: - Make sure that the landing-gear control-lever 6GA is in the DOWN position. - Put the warning notice in position to tell persons not to operate the landing gear or the landing gear doors.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 1(69)