• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-12 09:11来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).

 (3)
 Remove the warning notice(s).

 

 

 LANDING GEAR - SERVICING
________________________
 TASK 12-12-32-611-001
 Check Shock Absorber Fluid Level
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
 START A TASK ON OR NEAR:

 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
 GEAR.

 WARNING : MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY
_______
 PINS ARE INSTALLED.

 1. Reason for the Job
__________________
 Refer to the MPD TASK: 322113-02
 NOTE : As an alternative, the NLG Shock Absorber can be replenished with the
____
 aircraft on jacks (Ref. TASK 12-12-32-611-005).

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific approved nitrogen supply No specific hydraulic source No specific safety barriers No specific standard charging equipment No specific thermometer (-45 Deg. C to 70 Deg. C (-49 Deg. F to
 158 Deg. F))
 No specific warning notice
 No specific drain container 15 l (3.9625 USgal)
 No specific access platform 2 m (6 ft. 7 in.)
 No specific pressure gage 200 bar (2900.7540 psi)

R No specific Torque Wrench : range 0.00 to 1.20 m.daN R (0.00 to 9.00 lbf.ft) M21930 1 FILLING ASSEMBLY


 B. Consumable Materials

 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 02-001 USA MIL-H-5606
 OIL, HYDRAULICPETROLEUM FLUID (Ref. 20-31-00) Material No. 02-004
 SHOCK ABSORBER FLUID (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-14-32-614-004 Check Shock Absorber Charge Pressure 32-00-00-481-001 Installation of the Safety Devices on the Landing
 Gears 32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-22-00-410-001 Nose Gear Doors - Ground Doors Closing 12-12-32-991-001 Fig. 301 12-12-32-991-012 Fig. 302
 3. Job Set-up
__________
 Subtask 12-12-32-941-050
 A. Safety Precautions
 (1)
 Put the safety barriers in position.

 (2)
 Make sure that the ground safety locks are installed on the landing gear (Ref. TASK 32-00-00-481-001).

 (3)
 On panel 400VU, make sure that the landing-gear control-lever (6GA) is in the DOWN position.

 (4)
 Put a warning notice on panel 400VU, to tell persons not to operate the landing-gear controls.

 (5)
 Put a warning notice in position to tell persons not to operate the NLG doors.


 1EFF : ALL 1 12-12-32Page 302 1 1 May 01/05R 1 1 1CES 1


 Subtask 12-12-32-010-050
 B. Get Access WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
_______
 (1)
 Open the NLG doors (Ref. TASK 32-22-00-010-001).

 (2)
 Install the SAFETY PIN - NLG DOOR (98D32203502000) in the linkage of each forward NLG door (Ref. TASK 32-00-00-481-001).

 (3)
 Put the access platform in position at the NLG.


 4. Procedure
_________
 (Ref. Fig. 301/TASK 12-12-32-991-001, 302/TASK 12-12-32-991-012) Subtask 12-12-32-614-074
 A. Preparation for Replenishment
 CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED PRESSURE

_______ RANGE. THIS IS NECESSARY TO GET AN ACCURATE PRESSURE MEASUREMENT.
 (1)
 Prepare the standard charging equipment as follows:

 (a)
 Install the pressure gage (10) on the 3-way valve (12).

 (b)
 Connect the 3-way valve (12) to the filling hose (11).

 (c)
 Connect the hydraulic supply hose (18) between the hand pump (17) and the three-way valve (12).

 (d)
 Connect the hydraulic source hose (16) between the hand pump (17) and the hydraulic source.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM SERVICING 1(49)