• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-09-08 00:33来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

JS E-8C E8A (E-8C)
LC LTA SETUP COMMERCIAL
Table 2 – Project Codes
Supplier Quality Assurance Requirements
Rev. P, March 06, 2008
16
2.0 GENERAL AND PROJECT SPECIFIC REQUIREMENTS
QUALITY PROGRAM PLAN (QPP)
For new suppliers to Vought, the supplier shall develop a QPP that will form a
cross-reference between the line items of this document (SQAR), and the supplier's
procedures. The QPP shall be submitted to Vought in conjunction with Vought’s
Form PO-F003 The submittal shall consist of:
1. The cross-reference matrix per Appendix 1.
2. An Organizational Chart that depicts the Quality Organization and its functional
relationship to Inspection activities.
If a given line item is not applicable for the products intended to be supplied, then it
shall be so stated in the matrix All line items of SQAR must be addressed. Items
which are determined to be unacceptable to Vought, will be resolved prior to the
adding the supplier to the Vought Approved Supplier Directory (ASD).
NOTE: Should conflicts arise between this document and the applicable
governing specification, the specification shall take precedence.
2.1 QUALITY SYSTEM REQUIREMENTS
Supplier shall implement and maintain a quality management system in accordance
with the respective Quality System Standard listed in Table 1 of this document, as
appropriate for the type of product being delivered to Vought.
To determine the applicable Quality System requirements, the following questions
apply;
a) Is the product being procured airborne, non-airborne or special?
Airborne – Airborne products are those procurements intended for contract
deliverable flyaway aircraft and their associated sub-systems including nonmetallic
material applied to aircraft. Product that has contractual Engineering
and/or Quality requirements that affect the end item deliverable product.
Non-airborne – Non-airborne products are those products procured for nonflight
applications such as; production tooling, ground support equipment, test
laboratories, etc.
Special – Special requirements include procurements for; repairs from FAA
Repair Stations, Commercial off the Shelf (COTS), Purchases of Labor from
Calibration Laboratories, and technical service providers.
b) Does supplier have design authority?
Supplier Quality Assurance Requirements
Rev. P, March 06, 2008
17
c) Does supplier build or distribute product?
Cross-reference the information obtained in a, b, and c above in Table 1 to
determine the appropriate Quality System requirement.
Initial and subsequent periodic review of Supplier’s quality system may be
performed at the option of Vought. Objective evidence of Supplier’s compliance,
either by submittal of requested evidence, or evidence of “Other Party” evaluation,
may be acceptable for the purpose of re-survey to Vought.
Supplier name changes, changes in ownership, facility changes or changes in
senior Quality management may subject Supplier’s Quality System to reevaluation
by Vought. Supplier shall notify Vought’s Procurement Representative of any
aforementioned changes in writing. Vought will instruct Supplier on formal
notification actions and specific forms to submit, if necessary.
The Quality Management Systems identified in table 1, shall be the quality system
standards used in determining eligibility for the Vought Approved Suppliers
Directory (ASD). An “other party” quality system certification is required for those
standards noted in table 1 . Vought will recognize all “Other Party” certifications
issued by an accredited Certification/Registration Body (CRB). The accredited
CRB’s can be found on the SAE web page: www.sae.org/oasis.
Suppliers shall make available, a copy of their certifications to Vought. Any
changes to the certification such as a change of the CRB, update, withdrawal or
disapproval must also be forwarded to Vought immediately.
Note: "Other Party" - A registrar that has their accreditation body participate in the
IAQG/AAQG quality system certification oversight process. An "Other Party" quality
system certification would be one issued by an accredited registrar that participates
in the aerospace industry's IAQG/AAQG oversight process. Vought Aircraft
Industries, Inc. suppliers are authorized to share Vought Aircraft Industries, Inc.
survey results with other aerospace companies.
E-8C Repair Station Suppliers Only
Vought shall recognize the following Quality System Standards for the E-8C
program as follows:
1) FAA FAR Part 21 (Certification Procedure Products and Parts) – Suppliers of
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料40(44)