• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-15 20:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A017 Qualification Test Guide
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 7.16 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A OTIME/R
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Initial submittal 30 days prior to on-site acceptance testing.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Government approval/comments will be within 15 days after receipt
of the Qualification Test Guide. Contractor shall submit revised
Qualification Test Guide, if required, within 15 days after receipt of
Government comments.
AMQ-310
AFS-408
1
2
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 33 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A018 Request for Waiver
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 8.1 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A ASREQ
12. Date of First
Submission ASREQ 13. Date of Subsequent
Submission ASREQ 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Provide specification requirement to be waived, reason for waiver,
performance impact, implications if not approved, and proposed
consideration.
Government approval/comments will be within 15 days after receipt
of a Request for Waiver. Contractor shall submit a revised Request
for Waiver, if required, within 15 days after receipt of Government
comments.
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 34 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Sim
1. Data Item No. 2. Title of Data Item 3. Subtitle
A019 ECP
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 8.2 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A ASREQ
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submit within 30 days of the Government request.
Item 13: Updates as required with Government approval.
Advance approval of Government required prior to submittal.
ECP shall include a not-to-exceed (NTE) price if a firm fixed price
proposal cannot be submitted within 30 days.
ECP shall inlcude a description of the change and the specification
change language and address any impact on life cycle costs, spares,
support equipment, training, data, etc.
Government comments/approval will be provided within 30 days after
submittal of the ECP. Contract shall submit revised ECP, if required,
within 15 days after receipt of Government comments.
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 35 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 N/A TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Sim
1. Data Item No. 2. Title of Data Item 3. Subtitle
A020 Discrepancy Report N/A
4. Authority 5. Contact Reference 6. Requiring Office
FAA-ILS-014 Para. 8.4 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A N/A ASGEN N/A
12. Date of First
Submission See Item #14 13. Date of Subsequent
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料16(84)