曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Data requested in Log book for each battery maintained during the above period:
1. Aircraft type (removed from) A340-500 A340-600
2. Battery type
3. Serial Number
4. First Installation date
5. Flight hours since last check
6. Flight cycles since last check
7. Total battery flight hours
8. Date of removal
9. Reason for removal:
a) Scheduled regular check Yes
b) Scheduled general overhaul Yes
c) Unscheduled removal Confirmed Non confirmed
10. Details : Visual aspect comment
11. Capacity data
a) Capacity of the battery at initial discharge
b) Capacity of the battery at final check
c) Minimum cell capacity at final check
12. Voltage data (end of charge voltage of the cells)
a) Voltage mini
b) Voltage average
c) Voltage maxi
13. Distilled water data
a) Average quantity (cc)
b) Maxi quantity (cc)
14. Number of cells replaced due to capacity
due to charge voltage
due to others reasons
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
AIRBUS 330/340 Level D
Fly-By-Wire Simulator
ATTACHMENT 3
CONTRACT DATA REQUIREMENTS LIST (CDRL)
and
DATA ITEM DESCRIPTIONS (DID)
February 6, 2007
DTFAAC-07-R-01136
ATTACHMENT 3
Contract Data Requirements List (CDRL)
Data Item Description (DID)
A001 Program Management Plan
FAA-PM-001 Program Management Plan (PMP)
A002 Reserved
A003 Project Management Status Report
FAA-PM-004 Project Management Status Report (PMSR)
A004 Meeting Agenda
A004A PDR Data Package
A004B CDR Data Package
A005 Meeting Minutes
A006 Recommended Spares List
A007 Recommended Support Equipment List
A008 Recommended Tools and Test Equipment List
A009 Recommended Special Tools and Test Equipment List
A010 Training Documentation
A011 Training Syllabus and Course Content
A012 Quality assurance Plan
A013 Installation Drawings
A014 Site Plans
FAA-SI-004 Site Preparation Requirements & Installation Plan
A015 Site Readiness Review Report
A016 Acceptance Test Manual
A017 Qualification Test Guide
A018 Request for Waiver
A019 Engineering Change Proposal
A020 Discrepancy Report
FAA-ILS-014 Discrepancy Report
A021 Reserved
A022 Software Source Code
A023 Software Data Rights
A024 Maintenance Support Plan
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR)
number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining
positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a
requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A”
in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit
the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料16(71)