10.2.3 Site layout. A site layout plan and design to include detailed placement of the shelter, foundation,
electrical distribution network, fencing and gates, and modifications to access roads and buildings/structures
at each existing site. Identify elevations, contours, drainage, etc. planned at completion of site work.
10.2.4 Foundations. A detailed foundation design, construction procedures, and list of material for each site
as required. Concrete mixtures and concrete construction details to be identified.
10.2.5 Fence work. Identify types of fence work required (e.g. extending, relocating or modification fence/gates).
Provide detailed description and procedure on how fences/gate work will be accomplished.
10.2.6 Electrical. A detailed plan and design of electrical/telephone installation requirements and a list of
electrical and telephone materials required for each site. Include underground and above ground detailed plans.
A detailed plan identifying existing site electrical wiring/conduit locations is to be included. Include detailed
plans and procedures for additions and modifications to existing grounding systems.
10.2.7 Existing shelter modifications. A detailed design, procedure, and plan of each existing building or
structure to be modified or penetrated at each site. Include interconnection/interface equipment designs,
materials, and hookup procedures.
10.2.8 Equipment storage area. A detailed plan and procedure of storage area, space, facilities, and
security required at each site for CFE storage and staging.
10.2.9 Miscellaneous services. A detailed plan and procedure identifying the movement of contractor
personnel, mail, telephone, movement of material to and from each site, and portable sanitary facilities for
contractor personnel.
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 30 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A015 Site Readiness Review Report
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 6.4 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A See Item #14
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission ASREQ 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submit 15 days after Site Readiness Review.
Approved contractor format acceptable.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Government approval/comments will be within 15 days after receipt
of the Site Readiness Review Report. Contractor shall submit
revised report, if required, within 15 days after receipt of Government
comments.
AMQ-310
AFS-408
1
2
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 31 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A016 Acceptance Test Manual
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 7.15 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A OTIME/R
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Initial submittal 30 days prior to on-site acceptance testing.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Government approval/comments will be within 15 days after receipt
of the Acceptance Test Manual. Contractor shall submit revised
Acceptance Test Manual, if required, within 15 days after receipt of
Government comments.
AMQ-310
AFS-408
1
2
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 32 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
 