曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Lighting Systems festzulegen, die
Baugruppen bzw. Geräte liefern.
The purpose of this document is to establish quality
requirements for Goodrich Lighting Systems subsuppliers
2 Anwendungsbereich 2 Applicability
Dieses Dokument gilt für alle Lieferanten der
Goodrich Lighting Systems.
This document is intended for use by
Goodrich Lighting Systems suppliers
3 Begriffe und Abkürzungen 3 Terms and Abbreviation
SQAR
GLS
Allgemeine
Qualitätssicherungsanforderungen
für Lieferanten
Goodrich Lighting Systems
Supplier Quality Assurance Requirement
Goodrich Lighting Systems
GRESS General Requirements for
Equipment and System
Suppliers
General Requirements for Equipment and System
Suppliers
4 Beschreibung der Anforderungen 4 Description of the Requirements
Festlegen der
Beschaffungssicherungsforderungen für
Lieferanten, die Baugruppen bzw. Geräte an
GLS liefern.
Als Grundlage ist die SQAR Section 1
anzuwenden.
This requirement must be applied for all deliveries to
GLS of assemblies and units.
Basic requirement SQAR Section 1 has to be applied.
Die Forderungen werden im Formblatt F06-14
festgelegt und dem Lieferanten mit der
Erteilung des Auftrages übergeben.
Die darin festgelegten Anforderungen sind
vom Lieferanten zu erfüllen.
The requirements will be transmitted with the form
F06-14 to the Supplier.
Therefore the supplier has to be fulfil the stipulated
requirements.
5 Verfügbarkeit des Dokuments 5 Document Availability
Die gültige Ausgabe dieses SQAR-Dokuments ist
verfügbar auf der Homepage von
Goodrich Lighting Systems unter
http://www.lighting.goodrich.com
The latest valid revision of this document is available at the
Goodrich Lighting Systems Homepage under
http://www.lighting.goodrich.com
Supplier Quality Assurance Requirements
Goodrich Lighting Systems
SQAR Section 2 Ausgabe 1 Datum: 05.07.2005 Seite 4 von 5
Weitergabe sowie Verwertung und Mitteilung des Inhaltes an Dritte ist nur mit unserer ausdrücklichen Genehmigung gestattet.
Anhang:
6 Formblatt F06-14 6 Form F06-14
SQAR Section 2: Quality Requirements for Subcontractors (Partner Equipment)
Subcontractor
Buyer
Customer
Programme
GRH Part-No.
Description
Quality Management System according to EN 9100/AS9100 ISO 9001 Other:
Aviation Approvals:
EASA Part 21 Subpart G FAR 21/PMA STC ETSO/TSO EASA Part 145 FAR 145
Acceptance Test Procedure (ATP) Acceptance Test Report (ATR) (with each
delivery)
Qualification Test Plan (QTP) Qualification Test Report (QTR)
Declaration of Design & Performance (DDP) Project related Quality Assurance Plan (QAP)
EASA Form 1 or FAA 8130 (with each delivery) Certificate of Compliance (with each delivery)
Quality Questionnaire (Self Evaluation
Quality Management System)
If any special test equipment for Inspection at
Goodrich is required subcontractor is requested
to send an offer for this equipment
First Article Inspection Report (first delivery or
after changes of part, process, company etc.),
based on EN 9102 / AS 9102.
Production Organization Agreement according
to EASA Part 21.133
Project related Material Review Board Plan Quality Management Manual
Source Control Drawing Project related Configuration Management Plan
Quality Assurance Agreement Special Packaging:
Other: Other:
Supplier Quality Assurance Requirements
Goodrich Lighting Systems
SQAR Section 2 Ausgabe 1 Datum: 05.07.2005 Seite 5 von 5
Weitergabe sowie Verwertung und Mitteilung des Inhaltes an Dritte ist nur mit unserer ausdrücklichen Genehmigung gestattet.
GLS Customer Requirements
Airbus GRESS (General Requirements for Equipment and System Suppliers)
Must be applied Yes No
The supplier has to fulfil the Airbus GRESS requirements. This contains especially the following points.
· Supplier Process Development Planning
· Project Management Process for Maturity
· Project Management Process for Support
· Project Monitoring and Control
· Startegy for Obsolescence Management
· Configuration Management
· Ressource Management
· Information Management
· Electronic Data interchange
· Continuous Improvement
· Risk Management
For further information see the Airbus GRESS documentation in its latest issue.
Foreign Object Damage Instruction:
Must be applied Yes No
Other Costumer Requirements
Enclosure: SQAR General Supplier Quality Assurance Requirements Quality Questionnaire
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料16(163)