• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-15 20:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

SPOC 539 – REQUIRED SOURCES FOR JEWEL, MINIATURE AND INSTRUMENT BEARINGS *............................................. 92
SPOC 540 – TEARDOWN ANALYSIS INSPECTION *.................................................................................................................... 93
SPOC 541 – INSULATION, ISOLATION, DIELECTRIC TESTING * ............................................................................................... 93
SPOC 542 – DIODES – METALLURGICAL BOND *....................................................................................................................... 93
SPOC 543 – CERAMIC CAPACITOR LEAD WIRE REQUIREMENT – CANCELLED.................................................................... 93
SPOC 544 – CCA REQUIREMENTS .............................................................................................................................................. 93
SPOC 545 – INSPECTION REQUIREMENT................................................................................................................................... 94
SPOC 546 – INSPECTION REPORT REQUIREMENT – CANCELLED.......................................................................................... 94
SPOC 547 – SUMMARY REPORT REQUIREMENT ....................................................................................................................... 94
SPOC 548 – AOI (AUTOMATIC OPTICAL INSPECTION) OF CIRCUIT CARD ASSEMBLIES...................................................... 94
SPOC 549 – AXI (AUTOMATED X-RAY INSPECTION) OF CIRCUIT CARD ASSEMBLIES ......................................................... 95
SPOC 550 – PARTICLE IMPACT NOISE DETECTION (PIND) SCREENING * .............................................................................. 95
SPOC 551 – PURCHASE AND FINISH CCA REQUIREMENT........................................................................................................ 95
SPOC 552 – AUTOMATIC INSERTION TUBES............................................................................................................................. 96
SPOC 553 – DESTRUCTIVE PHYSICAL ANALYSIS (DPA) SAMPLES REQUIRED *................................................................... 96
SPOC 554 – WELD SAMPLE REQUIREMENTS – CANCELLED................................................................................................... 96
SPOC 555 – ELECTRON BEAM WELDING REQUIREMENT – CANCELLED............................................................................... 96
SPOC 556 – X-RAY REQUIREMENT FOR CAPACITORS – CANCELLED.................................................................................... 97
SPOC 557 – X-RAY FILM REQUIRED * ......................................................................................................................................... 97
SPOC 558 – WORKMANSHIP STANDARD ................................................................................................................................... 97
SPOC 559 – HONEYWELL CLEARWATER SPECIFIC REQUIREMENTS (INDIVIDUALLY APPLICABLE AS NOTED ON PO) –
CANCELLED................................................................................................................................................................................... 97
SPOC 560 – INTEGRATED CIRCUIT (ICT) AND FLYING PROBE (FP) REQUIREMENTS ** ....................................................... 98
APPENDIX I – SPOC 239 PACKAGING AND PACKAGE IDENTIFICATION – CANCELLED ....................................................... 98
Aerospace
Supplemental Purchase Order Conditions (SPOC) Manual
UNCONTROLLED IN HARDCOPY
Revision H Effective Date: 15 January 2009 1
*Revised / **Added
Section 1.0 General Requirements *
1.1 Preface*
This manual contains requirements that are applicable when invoked by Honeywell Aerospace Purchase Orders.
Requirements include the mandatory use of this manual for Contract Review and Quality Planning activities. Contents
of Sections 1–3 shall be reviewed and complied with in conjunction with the purchase order flow down. The SPOC
Manual is controlled in Electronic format as presented on the Supplier Portal. Paper copies, and electronic copies
downloaded and saved to a local hard drive are Uncontrolled. Suppliers shall visit the manual online to check for
changes that may be identified in the electronic change page at https://www.supplier.honeywell.com.
If the Supplier is working to a Purchase Order pre-dating the most current SPOC Manual release date, the Supplier
may request authorization to work to the most current SPOC manual revision by requesting a Purchase Order revision
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料16(107)