曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A011 Training Syllabus and Course Content
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 4.4 b,c,& d AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A See Item #14 0
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Preliminary submittal 1 month prior to Logistics Conference,
scheduled 6 months after contract award.
Final submittal 60 days prior to scheduled training classes.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Government approval/comments will be within 30 days after receipt
of syllabus. Contractor shall submit revised syllabus, if required,
within 30 days after receipt of Government comments.
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 255 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Sim
1. Data Item No. 2. Title of Data Item 3. Subtitle
A012 Q A Plan
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 5.0 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A OTIME
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission N/A 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submit with proposal. Will not be included in the proposal
page count.
The Quality Assurance Plan shall describe the overall plan,
procedures and controls that the contractor plans to use to provide
and maintain a satisfactory quality system as specifed by
ANSI/ASQC-Q-9002-1994 for hardware and software quality.
Contractor shall describe its plan for obtaining simulator Level D
certification and approval.
If contractor is ISO 9002 certified, provide copy of certification and
approved contractor Quality Assurance Plan.
Quality audits, deficiencies, corrective actions taken and inventory of
inspection, measuring, and testing equipment shall be made
available for government review as required.
AMQ-310 7
16. Total 1
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 26 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A013 Installation Drawings
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 6.2 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A OTIME/R
12. Date of First
Submission See item #14 13. Date of Subsequent
Submission See item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submittal shall be 30 days after Simulator Site Layout
Freeze Date.
Item 15: AMQ-310 - Letter of Transmittal only.
AFS-408 - Two hard copies and 1 reproducible distribution
in AutoCad software.
Approved contractor format acceptable.
Government approval/comments will be within 15 days after receipt
of the Installation Drawings. Contractor shall submit revised
drawings, if required, within 15 days after receipt of Government
comments.
AMQ-310
AFS-408
0
3
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 27 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Sim
1. Data Item No. 2. Title of Data Item 3. Subtitle
A014 Site Plan
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料16(81)