CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 18 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A005 Meeting Minutes
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 3.0-3.5, 4.3 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A ASREQ
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Initial submittal no later than 14 days after meetings,
reviews, conference etc.
Item 13: Government approval/comments will be within 30 days after
receipt of initial submittal. Contractor shall submit revised minutes, if
required, within 14 days after receipt of Government comments.
The minutes shall include at least the following information:
a. Type of meeting and date.
b. Meeting purpose and objective.
c. Summary of discussion, decisions, agreements reached.
d. A list of attendees.
e. Actions items resulting from the meeting.
f. Copies of all handouts, viewgraphs, and other presentation
materials
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Minutes shall contain the following statement on the cover page:
"NOTHING CONTAINED IN THE MINUTES OR DISCUSSIONS
RESULTING FROM THE MEETING SHALL BE CONSIDERED AS A
CHANGE TO THE CONTRACT REQUIREMENTS. IT IS FURTHER
UNDERSTOOD THAT IF CHANGES TO THE CONTRACT
REQUIREMENTS ARE ANTISIPATED AND/OR IDENTIFIED, THE
POTENTIAL CHANGE SHALL BE PROCESSED THROUGH
PROPER CONTRACT CHANNELS."
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not Used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 19 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A006 Recommended Spare Parts List
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 4.3.1 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A ASREQ 0
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Initial submittal shall be 1 month prior to the Logistics
Conference scheduled 6 months after contract award.
Item 13: Updated submittal shall be 30 days after the Logistic
Conference. Additional updates as required by the government.
The submittals shall be in the format listed in the SOW paragraph
4.3.1.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
Government approval/comments will be within 30 days after receipt
of initial submittal. Contractor shall submit revised list, if required,
within 30 days after receipt of Government comments.
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 20 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A007 Recommended Support Equipment List
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 4.3.2 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A ASREQ
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Initial submittal shall be 1 month prior to the Logistics
Conference scheduled 6 months after contract award.
Item 13: Updated submittal shall be 30 days after the Logistic
Conference. Additional updates as required by the government.
Approved contractor format acceptable.