• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-15 20:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

b) FORM2 : one data-sheet to be filled per battery checked in the battery shop
(must be the reflect of the data written in the log book)
n FORM2 in a month if n checks performed on batteries
F6177
SERVICE INFORMATION LETTER (S.I.L.)
2005, April 12th SIL N°04.99 – Rev.2 2
2) After a period of one year the operator shall submit the complete data set to Saft
for the approval of their request for extension.
BENEFITS
1) longer interval between maintenance then lower Direct Maintenance Cost
2) less handling, lower work load in battery shop, lower spares stock
3) lower administrative cost (planning, report forms release and dispatch)
EFFECTIVITY
Holders of P/N 405CH unit : CMM 24 38 53 CMM on Airbus A330 and/or A340 aircraft
P/N 505CH unit : CMM 24 38 54 CMM on Airbus A340-500/600 aircraft
F6177
SERVICE INFORMATION LETTER (S.I.L.)
2005, April 12th SIL N°04.99 – Rev.2 3
P/N 405CH BATTERY QPA=3 for AIRBUS A330 and A340
MAINTENANCE INTERVAL and EXTENSION PROCEDURE
Maintenance data feedback program FORM 1
Reporting period: Month / YYYY
I. AIRBUS LR fleet data
1. Quantity of aircraft in service
a) A330 aircraft
b) A340 aircraft
2. Total fleet flight hours (FH)
a) A330 fleet flight hours
b) A340 fleet flight hours
3. Total fleet cycles
a) A330 fleet cycles
b) A340 fleet cycles
4. Operating Hours (OH)
(Operating Hours = hours between Power ON including GPU supply duration)
a) A330 Operating Hours
b) A340 Operating Hours
II. P/N 405CH Battery data (removals)
1. Total number of scheduled (S.R.) and unschedulded (U.R.) battery removals
a) A330 schedulded and unschedulded battery
removals
b) A340 schedulded and unschedulded battery
removals
2. Number of unscheduled (U.R.) battery removals
a) A330 unscheduled battery removals
b) A340 unscheduled battery removals
3. Number of CONFIRMED U.R. (due to battery fault confirmed during
maintenance)
a) A330 Confirmed unscheduled battery removals
b) A340 Confirmed unscheduled battery removals
F6177
SERVICE INFORMATION LETTER (S.I.L.)
2005, April 12th SIL N°04-99 – Rev.2 4
P/N 405CH BATTERY QPA=3 for AIRBUS A330 and A340
MAINTENANCE INTERVAL and EXTENSION PROCEDURE
Maintenance data feedback program FORM 2
Reporting period:
Battery shop data Data sheet Month n°:
(with n= number of 405CH battery check during the month)
Data requested in Log book for each battery maintained during the above period:
1. Aircraft type (removed from) A330 A340
2. Battery type
3. Serial Number
4. First Installation date
5. Flight hours since last check
6. Flight cycles since last check
7. Total battery flight hours
8. Date of removal
9. Reason for removal:
a) Scheduled regular check Yes
b) Scheduled general overhaul Yes
c) Unscheduled removal Confirmed Non confirmed
10. Details : Visual aspect comment
11. Capacity data
a) Capacity of the battery at initial discharge
b) Capacity of the battery at final check
c) Minimum cell capacity at final check
12. Voltage data (end of charge voltage of the cells)
a) Voltage mini
b) Voltage average
c) Voltage maxi
13. Distilled water data
a) Average quantity (cc)
b) Maxi quantity (cc)
14. Number of cells replaced due to capacity
due to charge voltage
due to others reasons
F6177
SERVICE INFORMATION LETTER (S.I.L.)
2005, April 12th SIL N° 04.99 – Rev.2 5
P/N 505CH BATTERY QPA=3 for AIRBUS A340-500/600
MAINTENANCE INTERVAL and EXTENSION PROCEDURE
Maintenance data feedback program FORM 1
Reporting period:
I. AIRBUS LR fleet data
1. Quantity of aircraft A340-500/600 in service
2. Total A340-500/600 fleet flight hours (FH)
3. Total A340-500/-600 fleet cycles
4. A340-500/600 Operating Hours (OH)
(Operating Hours = hours between Power ON including GPU supply duration)
II. P/N 505CH Battery data (removals)
1. Total number of A340-500/600 scheduled (S.R.) and unschedulded (U.R) battery
removals
2. Number of A340-500/600 unscheduled (U.R) battery removals
3. Number of A340-500/600 CONFIRMED U.R.
(due to battery fault confirmed during maintenance)
F6177
SERVICE INFORMATION LETTER (S.I.L.)
2005, April 12th SIL N° 04.99 – Rev.2 6
P/N 505CH BATTERY QPA=3 for AIRBUS A340-500/600
MAINTENANCE INTERVAL and EXTENSION PROCEDURE
Maintenance data feedback program FORM 2
Reporting period:
Battery shop data Data sheet Month n°:
(with n= number of 505CH battery check during the month)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料16(70)