• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-15 20:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

building in continental Europe at 299 metres. Designed
by British architect Sir Norman Forster it was the first
economically built skyscraper in the world. Its energy
consumption is 25% to 30 % lower compared to a
conventional building. It has 9 gardens the highest
at 144 metres. Each of the gardens is 3 floors high
and covers an area of more than 200 m2 .
25 26
27
26
27
28
29
25
30
Location: Gelnhausen (20 km east of Frankfurt) – Germany
Project: Main-Kinzig-Forum
Application: AB-QM for Heating and Cooling
The new county government office will be completed in 2005 and
will be ready to house approx. 800 employees. Heating and cooling is
done via the ceiling. More specifically, the system is build as a 3-pipe
system with separate flow pipes for heating and cooling and a
common return. In each room an AB-QM is installed for hydronic
balance and room temperature control. The building utilises one of
Germany’s biggest geothermic energy systems designed by Swiss
engineer Peter Berchtold.
Location: Bad Homburg – Germany
Project: Fresenius AG
Application: AB-QM for Heating and Cooling
Fresenius is a global health care company with products and services
for dialysis, hospital and medical care of patients at home.
Worldwide Fresenius employs more than 72,000 people in approx.
100 countries. With 900 employees using the old headquarters
buildings in Bad Homburg, there simply wasn’t enough space. In
1998, a new building was built, adding 3,000 m2 of extra office space.
All buildings comply with high comfort and environmental standards
Location: Amsterdam – Holland
Project: Oval Tower
Application: AB-QM for Heating and Cooling
The Oval Tower is one of Amsterdam’s tallest buildings – 100 metres
high and contains 25,000 m2 of office space. Only 4 years after completion
the building had to be renovated as it was struggling with
balancing problems in its hydronic heating and cooling system. More
specifically, due to a greater demand for cooling and because of
significant problems with the hydronic balance, the building owner
decided to switch to Danfoss AB-QM combination valves to fix the
problem from the original installed manual valves.
and represent a felicitous combination of functionality and quality
with its heat insulated windows, water-saving rain water cisterns and
roof terrace.
To control the comfort of the room in the additional 3,000 m2 office
space, Zent-Frenger chilled ceilings have been installed to control
the comfort by means of Danfoss automatic balancing valves ABQM.
With the application of AB-QM the varying flows of each chilled
ceiling are easily and comprehensively set. This ensures perfectly
balanced chilled ceilings, even with partial load in case the demand
changes.
28 29
30
Location: Berlin – Germany
Project: The Museum of Natural History
Application: AB-QM for Heating and Cooling
The Museum of Natural History in Berlin is one of the most important
natural history museums in the world and holds collections of
more than 24 million objects.
In connection with some renovation of the existing heating
system of the Museum convector heaters were installed in all
exhibition rooms, to some extend combined with radiators. Each
exhibition room is now balanced hydraulically by means of automatic
balancing valves AB-QM.
Location: Astana – Kazakhstan
Project: Triumph Astana
Application: MSV for Heating and Cooling
Located near the river and city park in the new capital of
Kazakhstan the Triumph Astana will be an architectural landmark
in the city. Triumph Astana contains offices, apartments, sport
centre, theatre as well as restaurants. This massive building was
completed in 2005. Danfoss has supplied our range of manual
balancing valve to a 4-pipe heating and cooling system.
Combining all available expertise and knowledge this is nothing
short of a Triumph for city of Astana.
Location: Nijmegen – Holland
Project: Philips BIC
Application: AB-QM for Heating and Cooling
Phillips is not only one of the largest companies in Holland, but
also one of the largest electronic companies in the world. By 2007
Philips will move to these new premises in Nijmegen. For this
large building the installer chose Danfoss as a supplier because of
easy balancing especially for AB-QM.
The installation is a 4-pipe heating and cooling system with chilled
ceilings, which is controlled by PWM with Sauter BMS system.
Hungary
Housing Society Békéscsaba Budapest 1995 ASV-Q
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料16(6)