the next reporting period.
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 15 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus FBW Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A004 Meeting Agenda
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 3.0-3.5 4.3 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A A See Item #14 0
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission See Item #14 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 10. Submit an agenda for all formal meetings, reviews,
conferences, etc.
Item 12. Submit for Government approval no later than 14 calendar
days prior to meeting.
Item 13: Government will provide comments/approval 7 calendar
days after receipt. Contractor shall update agenda, as required, prior
to the meeting.
Approved Contractor format acceptable.
The Meeting Agenda shall include as a minimum the following, where
applicable:
The purpose and objective of the meeting
The meeting location, date, and duration
A daily chronological listing of each major topic or subtopic to
be discussed and the time to be devoted to each topic
A projected list of Contractor and Government attendees
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
AMQ-310
AFS-408
1
1
16. Total 2
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 16 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A004A PDR Data Package
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 3.4 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A N/A OTIME/R
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission ASREQ 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submit 15 days prior to PDR.
Data package shall include: sufficient documentation to confirm
design approach will establish a basic design and preliminary
engineering approach for overall system; system integration
sketches, preliminary drawings, and schematic diagrams; preliminary
Reliability, Maintainability, and Availability (RMA) data, and
preliminary ILS data including spares, test and support equipment.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
AMQ-310
AFS-408
1
2
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 17 of 40
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
003 TDP TM Other
D. System/Item E. Contract/PR No. F. Contractor
Airbus 330/340 Simulator
1. Data Item No. 2. Title of Data Item 3. Subtitle
A004B CDR Data Package
4. Authority 5. Contact Reference 6. Requiring Office
N/A Para 3.5 AFS-408
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A N/A OTIME/R
12. Date of First
Submission See Item #14 13. Date of Subsequent
Submission ASREQ 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
Item 12: Submit 15 days prior to Critical Design Review (CDR).
Data package shall include sufficient documentation to confirm
design and engineering approach for overall system is complete;
system integration, schematics, and equipment drawings are
complete; and detailed Reliability, Maintainability, and Availability
(RMA) data is available.
Item 15: Reproducible distribution shall be as described in SOW
paragraph 1.3.
AMQ-310
AFS-408
1
2
16. Total 3
G. Prepared By: H. Date I. Approved By J. Date
AFS-408
17. Price Group Not used 18. Estimated Total Price Not used
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料16(78)