• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2011-08-28 16:56来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

c)  a control that consumable fluids, gases etc. uplifted prior to flight are of the correct specification, free from contamination, and correctly recorded.
d)  a control that all doors are securely fastened.
e)  a control that control surface and landing gear locks, pitot/static covers, restraint devices and engine/aperture blanks have been removed.
f)  a control that all the aircraft’s external surfaces and engines are free from ice, snow, sand, dust etc.
2.  
Tasks such as oil and hydraulic fluid uplift and tyre inflation may be considered as part of the pre-flight inspection. The related pre-flight inspection instructions should address the procedures to determine where the necessary uplift or inflation results from an abnormal consumption and possibly requires additional maintenance action by the approved maintenance organisation or certifying staff as  appropriate.

3.  
In the case of commercial air transport, an operator should publish guidance to maintenance and flight personnel and any other personnel performing pre-flight inspection tasks, as appropriate, defining responsibilities for these actions and, where tasks are contracted to other organisations, how their accomplishment is subject to the quality system of M.A.712. It should be demonstrated to DGCA that pre-flight inspection personnel have received appropriate training for the relevant pre-flight inspection tasks. The training standard for personnel performing the pre-flight inspection should be described in the operator’s continuing airworthiness management exposition.


AMC M.A.301 - 2- Continuing airworthiness tasks
In the case of commercial air transport the operator should have a system to ensure that all defects affecting the safe operation of the aircraft are rectified within the limits prescribed by the approved minimum equipment list (MEL) or configuration deviation list (CDL) as appropriate. Also that such defect rectification cannot be postponed unless agreed by the operator and in accordance with a procedure approved by DGCA. In the case of commercial
Rev 0, dated 2nd March, 2010
 Section-2 CAR M air transport or large aircraft, a system of assessmet should be in operation to support the continuing airworthiness of an aircraft and to provide a continuous analysis of the effectiveness of the M.A. Subpart G approved continuing airworthiness management organisation’s defect control system in use. The system should provide for:
a)  significant incidents and defects: monitor incidents and defects that have occurred in flight and defects found during maintenance and overhaul, highlighting any that appear significant in their own right.
b)  repetitive incidents and defects: monitor on a continuous basis defects occurring in flight and defects found during maintenance and overhaul, highlighting any that are repetitive.
c)  deferred and carried forward defects: Monitor on a continuous basis deferred and carried forward defects. Deferred defects are defined as those defects reported in operational service which is deferred for later rectification. Carried forward defects are defined as those defects arising during maintenance which are carried forward for rectification at a later maintenance input.
d)  unscheduled removals and system performance: analyse unscheduled component removals and the performance of aircraft systems for use as part of the maintenance programme efficiency.
When deferring or carrying forward a defect the cumulative effect of a number of deferred or carried forward defects occurring on the same aircraft and any restrictions contained in the MEL should be considered. Whenever possible, deferred defects should be made known to the pilot/flight crew prior to their arrival at the aircraft.
AMC M.A.301 - 3- Continuing airworthiness tasks
The owner or the M.A. Subpart G approved continuing airworthiness management organisation as applicable should have a system to ensure that all aircraft maintenance checks are performed within the limits prescribed by the approved aircraft maintenance programme and that, whenever a maintenance check cannot be performed within the required time limit, its postponement is allowed in accordance with a procedure agreed by DGCA.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CONTINUING AIRWORTHINESS REQUIREMENTS CAR -M(44)