|  |  COMBUSTION CHAMBER ASSEMBLY BULKHEAD AND  | 
 |  |  FUEL INJECTOR GUIDE HEATSHEILD  | 
 |  |  CONTINUE-IN-SERVICE LIMITS  | 
 |  CONDITION  ............................................................... .. 
 |  FOUND  |  PERMITTED WITH REGULAR  |  PERMITTED WITH DECREASED  | 
 |  FIGURE 617  |  TIME INSPECTION  |  TIME INSPECTION  |
 ................................................................................. | Fuel Injector | All quantities of cracks or endcap segments that are missing | | Endcap | are permitted. If pieces of the endcap segments are missing, | | Segments | examine the 1st-stage and 2nd-stage HPT blades for FOD. | ................................................................................. | Radial Cracks | All quantities are permitted. See Figure 620. | | in the Fuel | | | Injector End | | | Cap/Tip | | | Heatshield | | ................................................................................. | Circumferen-| All quantities are permitted. See Figure 620. | | tial Cracks | | | along the | | | OD of the Fuel| | | Injector End | | | Cap/Tip | | | Heatshield | | ................................................................................. | End Cap | All quantities are permitted. See Figure 620. | | Material | | | Liberation | NOTE: Liberation is segments which are broken away.____| | of the Fuel | | | Injector End | | | Cap/Tip | | | Heatshield | | ................................................................................. | Burned Marks, | None are permitted. | | Erosion, | | | Distortion, | IMMEDIATELY REMOVE THE ENGINE | | or Holes in | | | the Bulkhead | | .................................................................................
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 72-00-00
 ALL  ú ú N02 Page 682V ú Jun 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
~...............................................................................
 | | TABLE 607 |
 .................................................................................
 |  |  COMBUSTION CHAMBER ASSEMBLY BULKHEAD AND  | 
 |  |  FUEL INJECTOR GUIDE HEATSHEILD  | 
 |  |  CONTINUE-IN-SERVICE LIMITS  | 
 |  CONDITION  ............................................................... .. 
 |  FOUND  |  PERMITTED WITH REGULAR  |  PERMITTED WITH DECREASED  | 
 |  FIGURE 617  |  TIME INSPECTION  |  TIME INSPECTION  |
 ................................................................................. | Radial or | None are permitted. | All quantities that are less | | Circumferen-| | than 0.50 inch (12.700 mm) in | | tial | | length are permitted. Cracks | | Bulkhead | | which go below a fuel injector| | Cracks | | heatshield are not permitted. | | | | Cracks which can connect and | | | | become a semicircle are not | | | | permitted. | 2...............…...............................…...............................1
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 72-00-00
 ALL  ú ú N01 Page 682W ú Jun 18/00 
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. 
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL //////////////////////// 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 发动机 ENGINE 1(76)