1 FOR SPECIFIED ACCESS
TO FIG. 601 PORT LOCATION, REFER A A B B BYPASS VALVE FOR THE FUEL/OIL
COOLER (REF)
ACCESS PORT AP-3 (231`)
FWD
ACCESS PORT AP-2 (233`)
A
BORESCOPE POSITIONING BORESCOPE
PATH POSITIONING LEVER LEVER FOR PATH
FOR THE STATOR VANE THE STATOR VANE
AP-2 PLUG CONTROL RING FOR AP-3 PLUG THE 5TH-STAGE STATOR VANE CONTROL RING FOR THE 6TH-STAGE STATOR VANE
6TH-STAGE
FWD 5TH-STAGE
HPC BLADE
HPC BLADE 6TH-STAGE HPC BLADE
7TH-STAGE 5TH-STAGE 6TH-STAGE HPC BLADE HPC VANE HPC VANE FWD
A-A B-B
L-A1111L-A1101
HPC Access Port Locations Figure 610 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
72-00-00
ALL ú ú N02 Page 680G ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES /MAINTENANCE MANUAL ////////////////////////
FUEL FLOW METER (REF) FWD
CC
MAIN
FUEL
LINE
FWD
(REF)
9TH-STAGE HPC BLADE
ACCESS PORT AP-4 (127`)
B
MAIN OIL FILTER HOUSING (REF) DEOILER (REF) HPC REAR CASE
D D
AP-5 INNER PLUG
BORESCOPE PATH FWD
ACCESS PORT AP-5 (214`)
C
HPC Access Port Locations Figure 610 (Sheet 2)
BORESCOPE PATH
AP-4 PLUG
L-A1110
8TH-STAGE
8TH-STAGE HPC BLADE
HPC VANE
C-C
11TH-STAGE HPC VANE
11TH-STAGE HPC BLADE
10TH-STAGE HPC VANE
10TH-STAGE HPC BLADE
KEY WASHER FWD
D-D OUTER PLUG AP-5 L-A1115
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
72-00-00
ALL ú ú N02 Page 680H ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
ACCESS PORT AP-7 (80`)
TURBINE CASE COOLING VALVE CONTROL CABLE (REF)
FF
E E
FWD
MAIN FUEL
LINE (REF)
ACCESS PORT AP-6 (98`)
TURBINE BLADE/VANE
D COOLING AIR VALVE (REF)
BORESCOPE
PATH BORESCOPE
FLANGE K PATH
AP-6 PLUG (REF)
KEY WASHER AP-7
FWD HPC REAR CASE OUTER PLUG
AP-7
INNER PLUG
FWD
13TH-STAGE
HPC VANE
12TH-STAGE 14TH-STAGE
13TH-STAGE HPC VANE 15TH-STAGE 14TH-STAGE HPC BLADE
HPC BLADE HPC BLADE HPC VANE
L-A1124 E-E F-F L-A1134
HPC Access Port Locations
Figure 610 (Sheet 3)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
72-00-00
ALL ú ú N02 Page 680I ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
No. 15 - HPC Vane and Blade (5th- through 15th-Stage) Inspection
________________________________________________________________
(c) Examine the 5th- thru 7th-stage blades for curled leading edge tips (Fig. 611). 1) A curled blade has these conditions: a) A three sided corner of blade material with a bend line that goes from the leading edge to the tip b) The bend makes an angle of between 20 and 90 degrees from the usual concave blade contour. 2) The continue-in-service limits that are given are for all areas of the curled blade, but not for the bend line. a) No dents, holes, cracks, or scratches are permitted on the bend line.
3) Curled blades must have a minimum of three (3) straight blades between them, with no more than six (6) on each stage.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 发动机 ENGINE 1(62)