• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 23:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Material No. 15-005  AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
 Material No. 15-006  AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)
 Material No. 16-003  F ASNB70720 COATING (OBSOLETE USE 16-021) (Ref. 20-31-00)
 1EFF : ALL 1 52-32-21Page 444 1 1 Aug 01/05R 1 1 1CES 1


 C. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
6 cotter pin 52-32-21 07 -040 10 cotter pin 52-31-21 42B-020 15 cotter pin 52-32-21 07 -040 41 cotter pin 52-32-21 22A-080 46 cotter pin 52-32-21 07 -040 57 cotter pin 52-32-21 07 -040 58 cotter pin 52-32-21 22A-010 75 cotter pin 52-32-21 45 -020 75 cotter pin 52-32-21 46 -020 77 cotter pin 52-32-21 45 -020 77 cotter pin 52-32-21 46 -020 87 cotter pin 52-32-21 45 -020 87 cotter pin 52-32-21 46 -020 91 cotter pin 52-32-21 45 -150 91 cotter pin 52-32-21 46 -160 96 cotter pin 52-32-21 45 -020 96 cotter pin 52-32-21 46 -100 103 cotter pin 52-32-21 45 -020
 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-31-11-820-003 Adjustment of the Vent Door 52-32-00-720-001 Functional Test of the AFT Cargo-Compartment Door 52-32-11-820-003 Adjustment of the Vent Door 52-32-13-000-001 Removal of the Lining and Insulation 52-32-13-400-001 Installation of the Lining and Insulation 52-71-12-400-002 Installation of the Proximity Switches 30WV and 32WV
 **ON A/C 001-049, 053-099, 101-105, 201-220,
 52-32-21-991-003 Fig. 404
 1EFF : ALL 1 52-32-21Page 445 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------**ON A/C 051-052,
 52-32-21-991-003-C Fig. 404A
 **ON A/C 106-149, 221-299, 301-399,
 52-32-21-991-003-B Fig. 404B
 **ON A/C 151-199,
 52-32-21-991-003-A Fig. 404C R **ON A/C 401-499,
R  52-32-21-991-003-D Fig. 404D **ON A/C 001-049, 053-099, 101-105, 201-220,
 52-32-21-991-004 Fig. 405
 **ON A/C 051-052,
 52-32-21-991-004-C Fig. 405A
 **ON A/C 106-149, 221-299, 301-399,
 52-32-21-991-004-B Fig. 405B
 **ON A/C 151-199,
 52-32-21-991-004-A Fig. 405C
R 1EFF : ALL 1 52-32-21Page 446 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------


REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
R **ON A/C 401-499,
R 52-32-21-991-004-D Fig. 405D
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 52-32-21-860-052
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the AFT cargo-compartment door (referred to as cargo door) is opened and safetied with the actuator safety locks (Ref. TASK 52-30-00-860-001).

 (2)
 Make sure that the access platform in position below the opened cargo door.

 (3)
 Make sure that the access panel(s) is (are) removed from the cargo door.

 (4)
 Make sure that the lining and the insulation is removed from the cargo door (Ref. TASK 52-32-13-000-001).

 (5)
 Make sure that the vent door cover is removed from the internal door structure.


 Subtask 52-32-21-865-057
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
R 1EFF : ALL 1 52-32-21Page 447 1 1 Aug 01/05 1 1 1CES 1


 4. Procedure
_________ **ON A/C 001-049, 053-099, 101-105, 151-199, 201-220,
 Subtask 52-32-21-910-051
 A. Preparation for Installation **ON A/C 001-049, 053-099, 101-105, 201-220,
 (Ref. Fig. 404/TASK 52-32-21-991-003) **ON A/C 151-199,
 (Ref. Fig. 404C/TASK 52-32-21-991-003-A) **ON A/C 001-049, 053-099, 101-105, 201-220,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门5(84)