(d)
Tighten the nut (55) with your hand. NOTE : Safety the nut (55) with the new cotter pin (56) after the
____ adjustment of the locking hook clearance.
Subtask 52-32-21-820-056
F. Adjustment Procedure
(1)
Turn the eccentric bolt (25) until the lower dead center of the applicable locking unit is correctly adjusted (Ref. TASK 52-32-11-820-002).
(2)
Make sure that the nut (27) is tightened and safety it with the new cotter pin (28) after the final adjustment.
R 1EFF : 051-052, 1 52-32-21Page A421 1 1 Aug 01/05 1 1 1CES 1
(3)
Make sure that the nut (21) is tightened and safety it with the new cotter pin (20) after the final adjustment.
(4)
Turn the eccentric bolt (57) until the clearance of the locking hooks is correctly adjusted (Ref. TASK 52-32-11-820-002).
(5)
Make sure that the nut (49) is tightened and safety it with the new cotter pin (48) after the final adjustment.
(6)
Make sure that the nut (55) is tightened and safety it with the new cotter pin (56) after the final adjustment.
(7)
Make sure that the locking units are correctly lubricated after the final adjustment. (Ref. TASK 12-22-52-640-002).
Subtask 52-32-21-720-054
G. Do the functional test of the locking mechanism (Ref. TASK 52-32-00-720-001).
5. Close-up
________ Subtask 52-32-21-865-070
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1MJ, 3801GX, 3802GX, 3803GX
Subtask 52-32-21-410-057
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Apply STORAGE PRESERVATION (Material No. 15-005) to all the components of the locking units and to the adjacent cargo
(3)
Install the access panel 826AR on the cargo door.
(4)
Remove the actuator safety locks and close the AFT cargo door (Ref. TASK 52-30-00-860-002).
(5)
Remove the access platform(s).
1EFF : 051-052, 1 52-32-21Page A422 1 1 Aug 01/05R 1 1 1CES 1
**ON A/C ALL
TASK 52-32-21-000-008 Removal of the Drift Pin Mechanism
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific rigging pin
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-32-13-000-001 Removal of the Lining and Insulation
**ON A/C 001-049, 053-099, 101-105, 201-220,
52-32-21-991-010 Fig. 410 **ON A/C 051-052,
52-32-21-991-010-C Fig. 410A **ON A/C 106-149, 221-299, 301-399,
52-32-21-991-010-B Fig. 410B
R 1EFF : ALL 1 52-32-21Page A423 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
**ON A/C 151-199,
52-32-21-991-010-A Fig. 410C R **ON A/C 401-499,
R 52-32-21-991-010-D Fig. 410D **ON A/C 001-049, 053-099, 101-105, 201-220,
52-32-21-991-011 Fig. 411
**ON A/C 051-052,
52-32-21-991-011-B Fig. 411A
**ON A/C 151-199,
52-32-21-991-011-A Fig. 411B
**ON A/C ALL
3. Job Set-up
__________
Subtask 52-32-21-010-058
A. Get Access
(1)
Open the AFT cargo-compartment door (referred to as cargo door) and install the actuator safety locks (Ref. TASK 52-30-00-860-001).
(2)
Put the access platform in position below the opened cargo door.
R 1EFF : ALL 1 52-32-21Page A424 1 1 Aug 01/05 1 1 1CES 1 Subtask 52-32-21-865-071
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门5(106)