(2)
Make sure that the locking handle is moved away from the recess of the handle flap but not in the UNLOCKED position.
(3)
Make sure that the access panel 826AR is removed from the cargo door.
4. Procedure
_________
**ON A/C 001-049, 053-099, 101-105, 201-220,
(Ref. Fig. 412/TASK 52-32-21-991-012)
**ON A/C 051-052,
(Ref. Fig. 412A/TASK 52-32-21-991-012-C)
**ON A/C 106-149, 221-299, 301-399,
(Ref. Fig. 412B/TASK 52-32-21-991-012-B)
R 1EFF : ALL 1 52-32-21Page A492 1 1 Aug 01/05 1 1 1CES 1
**ON A/C 151-199,
(Ref. Fig. 412C/TASK 52-32-21-991-012-A) R **ON A/C 401-499,
R (Ref. Fig. 412D/TASK 52-32-21-991-012-D) **ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,
Subtask 52-32-21-910-057
A. Preparation for Installation
(1)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(2)
Clean the component interface and/or the adjacent area.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Apply COMMON GREASE (Material No. 04-004) to the bolt (23), the threaded pin of the shaft (18) and the contact area of the support fitting (9).
R **ON A/C 106-149, 221-299, 301-399, 401-499,
Subtask 52-32-21-910-057-A
A. Preparation for Installation
(1)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(2)
Clean the component interface and/or the adjacent area.
(3)
Do an inspection of the component interface and/or the adjacent area.
(4)
Apply the COMMON GREASE (Material No. 04-004) to the bolts (10) and (23), and the mating surfaces of the support fitting (9) and the target lever (3).
1EFF : ALL 1 52-32-21Page A493 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 001-049, 053-099, 101-105, 201-220,
Subtask 52-32-21-560-054-A
B. Preparation for Replacement Component
(1)
Make sure that there are new tab washers (371) on the link assy (88).
(2)
If not, replace the tab washers (371) as follows:
(a)
Release the tab washers (371) from the jam nuts (372).
(b)
Remove the lower and top fork-ends (95) and (99) from the connection rod (370).
(c)
Remove and discard the tab washers (371) from the connection rod (370).
(d)
Apply COMMON GREASE (Material No. 04-004) to the threaded ends of the connection rod (370).
(e)
Install the new tab washers (371) and the two fork ends (95) and
(99) on the connection rod (370).
(3)
Make sure that the length between the two fork ends (95) and (99) of the replacement link assy (88) is as written down before.
Subtask 52-32-21-420-065-A
C. Installation of the Switch Mechanism
(1) Install the link assy (88) as follows:
(a) Install the upper fork-end (99) on the drive shaft lever (102) as follows:
1_ If removed, install the sleeve (100) into the fork-end (99).
2_ Put the fork end (99) in position to the drive shaft lever
(102) and install the bolt (101), the washer (98) and the nut
(97).
3_ Tighten the nut (97) and safety it with the new cotter pin
(96).
R 1EFF : 001-049, 053-099, 101-105, 201-220, 1 52-32-21Page A494 1 1 Aug 01/05 1 1 1CES 1 (b) Install the lower fork-end (95) to the target lever (90) as follows:
1_ If removed, install the bush (94) into the fork-end (95).
2_ Put the lower fork end (95) to the target lever (90) and
install the bolt (89), the washer (93) and the nut (92).
3_ Tighten the nut (92) and safety it with the new cotter pin
(91).
(2) Install the target lever (3) as follows:
(a)
If removed, install the target (365) with the bolts (366), the washers (363) and the nuts (362) on the target arm (364).
(b)
Install the target lever (90) as follows: 1 Put the target lever (90) on the support fitting (361) and
_ attach it with the washer (369) and the nut (368).
2 Tighten the nut (368) and safety it with the new cotter pin
_ (367).
(c) Install the lower fork end (95) to the target lever (90) (refer procedure (1) (b)).
**ON A/C 051-052,
Subtask 52-32-21-560-054
B. Preparation for Replacement Component
(1)
Make sure that there are new tab washers (11) on the link assy (19).