(4)
Close the AFT cargo door (Ref. TASK 52-30-00-860-002).
(5) Remove the access platform(s). R **ON A/C 151-199, 401-499,
Subtask 52-32-11-410-064-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the door lining and insulation mats on the cargo door (Ref. TASK 52-32-13-400-001).
(3)
Install the access panels 826AR, 826BR on the cargo door.
(4)
Close the AFT cargo door (Ref. TASK 52-30-00-860-002).
1EFF : ALL 1 52-32-11Page 707 1 1 Aug 01/05 1 1 1CES 1
(5) Remove the access platform(s).
R 1EFF : 151-199, 401-499, 1 52-32-11Page 708 1 1 Aug 01/05 1 1 1CES 1 LINING AND INSULATION - REMOVAL/INSTALLATION
____________________________________________
TASK 52-32-13-000-001
Removal of the Lining and Insulation
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
52-32-13-991-001 Fig. 401 R **ON A/C 151-199, 401-499,
52-32-13-991-001-A Fig. 401A
1EFF : ALL 1 52-32-13Page 401 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
3. Job Set-up
__________
Subtask 52-32-13-010-050
A. Get Access
(1) Open the AFT cargo-compartment door (referred to as cargo door) and install the actuator safety locks. (Ref. TASK 52-30-00-860-001).
(2) Put the access platform in position below the opened cargo door. Subtask 52-32-13-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU HYDRAULIC/HYD POWER/Y 3803GX N30 122VU DOORS/CARGO 1MJ T12 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
4. Procedure
_________
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
(Ref. Fig. 401/TASK 52-32-13-991-001) R **ON A/C 151-199, 401-499,
(Ref. Fig. 401A/TASK 52-32-13-991-001-A)
1EFF : ALL 1 52-32-13Page 402 1 1 Aug 01/05 1 1 1CES 1
Lining and Insulation of the AFT Cargo-Compartment Door
Figure 401/TASK 52-32-13-991-001
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 52-32-13Page 403 1301-399, 1May 01/05 1 1 1CES 1
Lining and Insulation of the AFT Cargo-Compartment Door Figure 401A/TASK 52-32-13-991-001-A
R 1EFF : 151-199, 401-499, 1 52-32-13Page 404 1 1 Aug 01/05 1 1 1CES 1R **ON A/C ALL
Subtask 52-32-13-020-050
A. Removal of the Protective Lining
(1)
Release the quick-release fasteners (2) to disconnect the protective lining (3) from the cargo door (1).
(2)
Carefully disengage the VELCRO tapes and remove the protective lining
(3) together with the self-adhesive insulation from the cargo door (1).
1EFF : ALL 1 52-32-13Page 405 1 1 Feb 01/00 1 1 1CES 1
TASK 52-32-13-400-001
Installation of the Lining and Insulation
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION