 Material No. 16-002  GB BAEP 3536 POLYURETHANE TOPCOAT GREY (FOR INTERNAL APPLIC.) (Ref. 20-31-00)
 Material No. 16-006 ANTI-CORROSION PRIMER (EPOXY-IMPRVD ADHESION) (Ref. 20-31-00)
 1EFF : 301-399, 1 52-22-31Page 433 1 1 May 01/04 1 1 1CES 1 C. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-23-47-000-004  Removal of the Door Frame Linings of the LH FWD
 Emergency Exit Door, zone 231
 25-23-47-000-009  Removal of the Door Frame Linings of the RH FWD
 Emergency Exit Door, zone 232
 25-23-47-000-010  Removal of the Door Frame Linings of the LH/RH AFT
 Emergency Exit Doors, zones 251/252.
 52-22-00-010-001  Opening of the Emergency Exit Doors from the
 Passenger Compartment
 52-22-00-410-001  Closing of the Emergency Exit Doors from the
 Passenger Compartment
 52-22-00-820-002  Adjustment of the Emergency Exit Door
 52-22-00-860-003  Special Precaution before Maintenance on the Door
 Damper and Emergency Operation Cylinder
 52-22-00-860-004  Special Precaution after Maintenance on the Door
 Damper and Emergency Operation Cylinder
 52-22-12-400-004  Installation of the Guide Arm Assy
 52-22-31-991-003  Fig. 406
 3. Job Set-up__________
 Subtask 52-22-31-860-052

 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the applicable emergency exit door (referred to as door) is opened as required (Ref. TASK 52-22-00-010-001).

 (2)
 Make sure that the special precaution on the door damper and emergency operation cylinder is completed (Ref. TASK 52-22-00-860-003).

 (3)
 Make sure that the access platform is in position below the partly opened door.

 (4)
 Make sure that the applicable door frame linning is removed as required (Ref. TASK 25-23-47-000-004), (Ref. TASK 25-23-47-000-009) or (Ref. TASK 25-23-47-000-010).

 (5)
 Make sure that the insulation blakets are removed as required.


 1EFF : 301-399, 1 52-22-31Page 434 1 1 May 01/04 1 1 1CES 1


 4. Procedure
_________ Subtask 52-22-31-910-052
 A. Preparation for Installation
 (Ref. Fig. 406/TASK 52-22-31-991-003)

 (1) Remove the old sealant from the hinge fittings (54) and (59), the serrated plates (52), (53), (57) and (58) and the door frame
 NOTE : Use a wooden or plastic scraper.
____
 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Do an inspection of the component interface and/or the adjacent area.

 (4)
 Apply a layer of SEALANTS (Material No. 09-016) to the mating surface of the bolts (56) and the nuts (51).


 Subtask 52-22-31-420-052
 B. Installation of the Guide-Arm Attachment Fittings
 (Ref. Fig. 406/TASK 52-22-31-991-003)

 (1) Install the guide-arm hinge fitting (54) (referred to as hinge fitting) as follows:
 (a) Put the hinge fitting (54) and the serrated plates (52) and (53) in position at the filler plates of the door frame.
 NOTE : Make sure that their identification notches align.
____
 (b) Install the bolts (56), the washers (55) and the nuts (51).
 (2) Install the guide-arm hinge fitting (59) (referred to as hinge fitting) as follows:
 (a) Put the hinge fitting (59) and the serrated plates (58) and (57) in position at the filler plates of the door frame.
 NOTE : Make sure that their identification notches align.
____
 (b) Install the bolts (56), the washers (55) and the nuts (51).
 (3) Install the guide arm on the applicable hinge fitting (54) or (59) (Ref. TASK 52-22-12-400-004).
 1EFF : 301-399, 1 52-22-31Page 435 1 1 May 01/04 1 1 1CES 1 Subtask 52-22-31-820-052


 C. Adjust the parallel motion of the emergency exit door (Ref. TASK 52-22-00-820-002).
 5. Close-up
________ Subtask 52-22-31-410-052
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Apply a layer of SEALANTS (Material No. 09-013) around the edges of the hinge fittings (54) and (59).

 (3)
 Apply a layer of STRUCTURE PAINTS (Material No. 16-006) and STRUCTURE PAINTS (Material No. 16-002) to the nuts (56) and the bolts (59).

 (4)
 Put the removed insulation blankets on the door frame and attach them with the VELCRO tapes.
 