(4)
Make sure that the door linings are removed (Ref. TASK 25-23-47-000-012) or (Ref. TASK 25-23-47-000-013).
4. Procedure
_________ Subtask 52-22-22-910-053
A. Preparation for Installation
(1)
Make sure that the parts retained from the removed component are clean and in the correct condition.
(2)
Do an inspection of the component interface and/or the adjacent area.
(3)
Make sure that the bush (129) is in the correct condition.
(4)
Apply COMMON GREASE (Material No. 04-004) to all surfaces of parts which move.
Subtask 52-22-22-420-053
B. Installation of the Release Shaft Assembly
(1) Install the bearing brackets (108) and (118) on the structure as folows:
(a)
Install the bearings (109) and (119) in the bearing brackets
(108) and (109).
(b)
Put the bearing brackets (108) and (118) in position on the structure.
1EFF : 301-399, 1 52-22-22Page 435 1 1 May 01/04 1 1 1CES 1
(c) Install the bolts (116) and (135), the washers (115) and (134) and the nuts (114) and (133).
(2)
Install the release shaft (117) to the structure as follows:
(a)
Move the release shaft (117) into the bearing (109).
(b)
Put the lever (112) in position on the release shaft (117) and move the release shaft (117) into the bearing (119).
(c)
Make sure that the lever (112) is in the correct position and install the bolt (113), the washers (110) and the nut (111).
(3)
Install the release lever (105) on the release shaft (117) as follows:
(a)
Install the washers (107) and the release lever (105) on the end of the release shaft (117).
(b)
Make sure that the release lever (105) is in the correct position and install the bolt (103), the washers (104) and the nut (106).
(4)
Install the operation lever (122) on the release lever (117) as follows:
(a)
Assemble the washers (120), the circlip (121) and the operation lever (122) on the end of the release shaft (117).
(b)
Make sure that the operation lever (122) is in the correct position and install the bolts (130), the washers (123) and the nuts (124).
(5)
Attach the connection rod (128) to the operation lever (122) as follows:
(a)
If removed, install the bush (129) in the fork-end of the
operation lever (122).
(b)
Put the eye-end of the push rod (128) into position at the fork lever (122).
(c)
Install the bolt (126), the washers (125), the bush (127) and the nut (132) to the operation lever (122).
1EFF : 301-399, 1 52-22-22Page 436 1 1 May 01/04 1 1 1CES 1
(d) Tighten the nut (132) and safety it with a new cotter pin (131). WARNING : BE CAREFUL WHEN YOU REMOVE OR INSTALL THE SPRING. THE
_______ TENSION IN THE SPRING CAN CAUSE INJURY TO PERSONS.
(6) Attacht the spring element (102) on the structure bracket (101) and the lever (112).
Subtask 52-22-22-720-053
C. Do the functional test to make sure that the slide release mechanism operates satisfactorily (Ref. TASK 52-22-00-720-001).
5. Close-up
________ Subtask 52-22-22-865-061
A. Make sure that this(these) circuit breaker(s) is(are) closed:
13WN, 15WN, 48WV
Subtask 52-22-22-410-057
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the insulation mats in the door structure.
(3)
Install the door linings (Ref. TASK 25-23-47-400-012) or (Ref. TASK 25-23-47-400-013).
(4)
Do the special precaution for the door damper and emergency operation cylinder (Ref. TASK 52-22-00-860-004).
(5)
Close applicable the door (Ref. TASK 52-22-00-410-001).
(6)
Remove the access platform(s).
1EFF : 301-399, 1 52-22-22Page 437 1 1 May 01/04 1 1 1CES 1 FITTINGS - DOOR - REMOVAL/INSTALLATION
______________________________________
TASK 52-22-31-000-001
Removal of the Adjustable Stops and Roller Guides from the Emergency Exit Door
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门3(144)