• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 23:52来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1) Remove the old sealant from the door frame , the stop fittings (23) and the guide fittings (26), (35), (40), (43) and (48).
 NOTE : Use a wooden or plastic scraper.
____

 (2)
 Clean the component interface and/or the adjacent area.

 (3)
 Do an inspection of the component interface and/or the adjacent area.

 (4)
 Apply a layer of SEALANTS (Material No. 09-016) to the mating surface of the stop fittings (23) and the guide fittings (26), (35), (40),

 (43) and (48).

 (5)
 Apply a layer of SEALANTS (Material No. 09-016) to the mating surface of the bolts (22), (31) (36), (41), (42) and (47) the nuts (21), (32), (37), (38), (46) and (50).


 Subtask 52-22-31-420-051
 B. Installation of the Stop and Guide Fittings
 (Ref. Fig. 403/TASK 52-22-31-991-002)

 (1)
 Install the stop fittings (23) as follows:

 (a)
 Put the stop fitting (23) in position at the door frame and attach it with the bolts (22) and the nuts (21).

 (b)
 Apply a layer of SEALANTS (Material No. 09-013) aruond the edges of the stop fitting (23).

 

 (2)
 Assemble the upper guide fitting (26) as follows:

 (a)
 Put the stop bolt (30) together with the washers (27) and (28) inposition at the upper guide fitting (26).

 (b)
 Install the nut (29) at the stop bolt (30) and tighten it.

 


 1EFF : 301-399, 1 52-22-31Page 418 1 1 May 01/04 1 1 1CES 1 (3) Install the upper guide fittings (26) as follows:


 (a) Put the upper guide fitting (26) and the serrated plate (25) in position at the serrated plate (24).
 NOTE : The serrated plate (24) is riveted to the door frame.
____
 (b)
 Make sure that their identification notches align.

 (c)
 Install the screws (31) and the nuts (32.


 (4) Install the lower guide fittings (35) as follows:
 (a) Put the lower guide fitting (35) and the serrated plate (34) in position at the serrated plate (33).
 NOTE : The serrated plate (33)is riveted at the door frame.
____
 (b)
 Make sure that their identification notches align.

 (c)
 Install the bolts (36) and the nuts (37) and tighten them.


 (5)
 Install the upper guide fitting (40) as follows:

 (a)
 Put the upper guide fitting (40) and the shim (39) in position at the door frame.

 (b)
 Install the bolts (41) and the nuts (38).

 

 (6)
 Install the guide fitting (43) as follows:

 (a)
 Put the guide fitting (43) and the shim (44) in position at the door frame.

 (b)
 Install the bolts (42), the washers (45) and the nuts (37).

 

 (7)
 Install the lower guide fitting (48) as follows:


 (a) Put the lower guide fitting (48) and the shim (49) in position at the door frame.
 (b) Install the bolts (47) and the nuts (50). Subtask 52-22-31-820-051
 C. Adjust the stop and guide fittings at the door frame (Ref. TASK 52-22-31-820-001).
 1EFF : 301-399, 1 52-22-31Page 419 1 1 May 01/04 1 1 1CES 1


 5. Close-up
________ Subtask 52-22-31-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Put the insulation blankets on the door frame and attach them with the VELCRO tapes.

 (3)
 Install the removed door frame linings (Ref. TASK 25-23-47-400-004), (Ref. TASK 25-23-47-400-009) or (Ref. TASK 25-23-47-400-010).

 (4)
 Do the special precaution for the door damper and emergency operation cylinder (Ref. TASK 52-22-00-860-004).

 (5)
 Close applicable the door (Ref. TASK 52-22-00-410-001).

 (6)
 Remove the access platform(s).


 1EFF : 301-399, 1 52-22-31Page 420 1 1 May 01/04 1 1 1CES 1 TASK 52-22-31-820-001


 Adjustment of the Stop and Guide Fittings
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 3.20 m (10 ft. 6 in.)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门3(149)