R - STRUCTURE PAINTS (Material No. 16-001)
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-004)
R (6) Apply the materials that follow in the given sequence to the area E7:
R - BONDING AND ADHESIVE COMPOUNDS (Material No. 08-008)
R - STRUCTURE PAINTS (Material No. 16-006B) / STRUCTURE PAINTS
(Material No. 16-006C)
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-005)
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (7) Apply the materials that follow in the given sequence to the area E8:
R - STRUCTURE PAINTS (Material No. 16-018)
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-003)
R (8) Apply the material that follows to the area E9:
R - STRUCTURE PAINTS (Material No. 16-002)
R (9) Apply the materials that follow in the given sequence to the area
R E10:
R - STRUCTURE PAINTS (Material No. 16-006B) / STRUCTURE PAINTS
(Material No. 16-006C)
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-005)
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (10) Apply the materials that follow in the given sequence to the area
R E12:
R - BONDING AND ADHESIVE COMPOUNDS (Material No. 08-008)
R - STRUCTURE PAINTS (Material No. 16-006B) / STRUCTURE PAINTS
(Material No. 16-006C)
R - STRUCTURE PAINTS (Material No. 16-018)
R (11) Apply the paint to the area E13.
R (a) Apply the paint for the area E5 and the area E6.
R (b) Apply the material that follows to the area E13:
R - STRUCTURE PAINTS (Material No. 16-018B)
R NOTE : The areas E1 and E11 are not painted.____
R
5. Close-up
________ Subtask 51-23-00-865-053
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 15CE1, 15CE2, 16CE1, 16CE2.
Subtask 51-23-00-410-051
B. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Remove the access platform(s).
(3)
Remove the warning notice(s).
(4)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
1EFF : ALL 1 51-23-00Page 230 1 1 May 01/04R 1 1 1CES 1
TASK 51-23-00-370-005
Application of Paint and Protective Coatings - Stabilizer Areas
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______ CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
-
THE FLIGHT CONTROLS
-
THE FLIGHT CONTROL SURFACES
-
THE LANDING GEAR AND THE RELATED DOORS
-COMPONENTS THAT MOVE.
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______ FALL CAN INJURE OR KILL YOU.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL MATERIALS
_______ ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______ IF YOU DO:
-RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
-WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
CAUTION : DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF
_______ CARBONFIBER REINFORCED PLASTIC.
1. Reason for the Job
__________________
Self Explanatory
1EFF : ALL 1 51-23-00Page 231 1 1 May 01/04R 1 1 1CES 1
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM STANDARD PRACTICES AND STRUCTURES(15)