3. Job Set-up
__________
Subtask 51-23-00-860-053
A. Aircraft Maintenance Configuration
(1) Put a WARNING NOTICE in position to tell persons not to operate the flight controls.
Subtask 51-23-00-010-052
B. Get Access
(1) Put a ACCESS PLATFORM 6M (20 FT) - ADJUSTABLE in position as necessary to get access to the work area.
4. Procedure
_________
(Ref. Fig. 203/TASK 51-23-00-991-003, 204/TASK 51-23-00-991-004)
Subtask 51-23-00-916-051
A. Application of the Protective Coating
WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL
_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN.
_______
IF YOU DO:
-RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
-WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
R (1) Apply the materials that follow in the given sequence to the area D1: R - CAA UNSEALED
-STRUCTURE PAINTS (Material No. 16-006)
(2) Apply the materials that follow in the given sequence to the area D4:
-TEDLAR FOIL
-STRUCTURE PAINTS (Material No. 16-006B)
NOTE : Protective coating is not necessary on the areas D2, D3, D5,
____
D6 and D7.
Paint and Protective Coatings - Fuselage External Areas
Figure 203/TASK 51-23-00-991-003
Moisture-Removing Oil Coatings - Fuselage External Areas
Figure 204/TASK 51-23-00-991-004
R Subtask 51-23-00-370-051-A
R B. Application of the Paint
R WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______
R MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.
R OBEY THE MANUFACTURERS INSTRUCTIONS.
R PUT ON PROTECTIVE CLOTHING.
R DO NOT GET THEM IN YOUR MOUTH.
R DO NOT SMOKE.
R DO NOT BREATHE THE GAS.
R THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.
R GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.
R WARNING : DO NOT GET THE COMPOUND ON YOUR SKIN._______
R IF YOU DO:
R - RUB IT OFF IMMEDIATELY WITH A CLEAN CLOTH
R - WASH THE SKIN WITH SOAP AND RINSE WITH CLEAN WATER.
R (1) Apply the materials that follow in the given sequence to the area D1:
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (2) Apply the materials that follow in the given sequence to the area D2:
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R NOTE : Refer to the Component Maintenance Manual 53-15-11, for the____
R paint that was applied before.
R (3) Apply the materials that follow in the given sequence to the area D3:
R - STRUCTURE PAINTS (Material No. 16-001)
R - PORE FILLER (if necessary)
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (4) Apply the materials that follow in the given sequence to the area D4:
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-005)
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (5) Apply the materials that follow in the given sequence to the area D5:
R - STRUCTURE PAINTS (Material No. 16-040)
R - PAINTS FOR DETAIL (INTERNAL AND EXTERN AL) (Material No. 07-005)
R (6) Apply the materials that follow in the given sequence to the area D6
R (external):
R - BONDING AND ADHESIVE COMPOUNDS (Material No. 08-008)
R - STRUCTURE PAINTS (Material No. 16-040)
R - STRUCTURE PAINTS (Material No. 16-020)
R - STRUCTURE PAINTS (Material No. 16-001)
R - STRUCTURE PAINTS (Material No. 16-018)
R (7) Apply the materials that follow in the given sequence to the area D6