3. Job Set-up
__________
Subtask 23-73-64-861-052
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
**ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 23-73-64-865-056
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G02
2000VU PASSENGER READING LIGHT 2LW G03
2000VU PASSENGER READING LIGHT 3LW G04
2000VU PASSENGER READING LIGHT 4LW G05
2000VU PASSENGER READING LIGHT 5LW G06
2000VU PASSENGER READING LIGHT 6LW G07
R **ON A/C 151-199, 301-399, 401-499,
Subtask 23-73-64-865-060
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2000VU PASSENGER READING LIGHT 1LW G1
2000VU PASSENGER READING LIGHT 2LW G2
2000VU PASSENGER READING LIGHT 3LW G3
2000VU PASSENGER READING LIGHT 4LW G4
2000VU PASSENGER READING LIGHT 5LW G5
2000VU PASSENGER READING LIGHT 6LW G6
1EFF : ALL 1 23-73-64Page 402 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 23-73-64Page 403 1 1 Aug 01/05 1 1 1CES 1
**ON A/C ALL
4. Procedure_________
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
R (Ref. Fig. 401/TASK 23-73-64-991-001) **ON A/C 106-149, 301-399, 401-499,
(Ref. Fig. 401A/TASK 23-73-64-991-001-A) **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
Subtask 23-73-64-020-050
R R R R R R R A. Removal of the reading light (1) Remove the bulb of the reading light. (a) Remove the lens (3) from the reading light (6). (b) Remove the bulb (4) from the reading light (6). (2) Remove the reading light. (a) Remove the section hose from one side of the mounting rail . (b) Pull and lower the related Passenger Service/Information Unit (PSIU) (2). (c) Disconnect the electrical connectors (5) from the reading light (6). (d) Remove the spring ring (1) from the reading light (6). (e) Remove the reading light (6) from the PSIU (2).
Reading Light
Figure 401/TASK 23-73-64-991-001
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 23-73-64Page 404 1201-299, 1May 01/05 1 1 1CES 1
Reading Light Figure 401A/TASK 23-73-64-991-001-A
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-64Page 405 1 1 Aug 01/05 1 1 1CES 1
R **ON A/C 106-149, 301-399, 401-499,
Subtask 23-73-64-020-050-A
R A. Removal of the reading light
R (1) Remove the section hose (3) from one side of the mounting rail (2).
R (2) Pull and lower the related Passenger Service/Information Unit (PSIU)
R (5).
(3) Disconnect the electrical connectors (6) from the reading light (7).
R (4) Remove the spring ring (4) from the reading light (7).
(5) Remove the reading light (7) from the PSIU (5).
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-64Page 406 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
TASK 23-73-64-400-001
Installation of the Reading Light
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
98A25207503000 1 PULLEY ASSEMBLY - SEALING CORD
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(171)