1EFF : ALL 1 23-73-34Page 406 1 1 Feb 01/05 1 1 1CES 1
 3. Job Set-up
__________
 Subtask 23-73-34-865-051
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 101RH
 **ON A/C 001-049, 051-099, 101-105, 201-299,
 49VU COM/CIDS/DIR 1 AND 2/ESS 150RH G02 R **ON A/C 106-149, 301-399, 401-499,
 49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05 R **ON A/C 106-149, 151-199, 301-399, 401-499,
 49VU COM DIR ESS/1 150RH G01 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
 121VU COM NAV/CIDS/DIR 1 AND 2/NORM 151RH M05 **ON A/C 301-399,
 121VU COM NAV/CIDS/DIR NORM/1 151RH M06 R **ON A/C 106-149, 301-399, 401-499,
 122VU AIR COND/CIDS/SDF/DIR NORM/1 17WH T17 **ON A/C ALL
 FOR 102RH
 1EFF : ALL 1 23-73-34Page 407 1 1 Aug 01/05 1 1 1CES 1
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 051-099, 101-105, 201-299, 
R  49VU COM/CIDS/DIR 1 AND 2/ESS **ON A/C 106-149, 301-399, 401-499, 150RH  G02  
R  49VU AIR COND/CIDS/SDF/DIR2 ESS **ON A/C 106-149, 401-499, 18WH  C06  
R  49VU COM/CIDS/DIR ESS/2 **ON A/C 106-149, 151-199, 301-399, 401-499, 157RH  G02  
49VU COM DIR ESS/1 **ON A/C 151-199, 301-399, 150RH  G01 
 49VU COM DIR ESS/2 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 157RH  G02 
R  121VU COM NAV/CIDS/DIR 1 AND 2/NORM **ON A/C 106-149, 151-199, 401-499, 151RH  M05  
121VU COM NAV/CIDS/DIR NORM/2 **ON A/C 301-399, 156RH  M06 
 121VU COM NAV/CIDS/DIR NORM/2 121VU COM NAV/CIDS/DIR NORM/1  156RH 151RH  M07M06
1EFF : ALL 1 23-73-34Page 408 1 1 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R **ON A/C 106-149, 301-399, 401-499,
 122VU AIR COND/CIDS/SDF/DIR NORM/2 14WH T18 **ON A/C ALL
 4. Procedure
_________
 **ON A/C 001-049, 051-099, 101-105, 201-299,
 Subtask 23-73-34-420-050
 A. Installation of the CIDS Directors NOTE : The installation procedures of the two CIDS Directors are not the
____
 same.
 (1)
 Installation of the CIDS Director 1
 (a)
 Clean the component interface and/or the adjacent area.
 (b)
 Do an inspection of the component interface and/or the adjacent area.
 (c)
 Remove the blanking caps from the electrical connectors (1).
 (d)
 Make sure that the electrical connectors (1) are clean and in the correct condition.
 (e)
 Install the CIDS director 1(5) on its rack (2).
 (f)
 Push the CIDS director 1(5) on its rack (2) to connect the electrical connectors (1).
 (g)
 Engage the nuts (3) on the lugs (4) and tighten.
 (2)
 Installation of the CIDS Director 2
 (a)
 Remove the CIDS Director 1 (101RH) (Ref. TASK 23-73-34-000-001).
 (b)
 Clean the component interface and/or the adjacent area.
 1EFF : ALL 1 23-73-34Page 409 1 1 Aug 01/05 1 1 1CES 1
 (c)
 Do an inspection of the component interface and/or the adjacent area.
 (d)
 Remove the blanking caps from the electrical connectors (1).
 (e)
 Make sure that the electrical connectors (1) are clean and in the correct condition.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(114)