R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 416 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R **ON A/C 106-149, 401-499,
121VU COM NAV/CIDS/DEU A NORM/R AFT 168RH M12 121VU COM NAV/CIDS/DEU A NORM/L AFT 167RH M11 121VU COM NAV/CIDS/DEU A NORM/R FWD 164RH M10 121VU COM NAV/CIDS/DEU A NORM/L FWD 163RH M09 121VU COM NAV/CIDS/DEU B/NORM 162RH M08 121VU COM NAV/CIDS/DIR NORM/2 156RH M06
**ON A/C 301-399,
121VU COM NAV/CIDS/DEU A NORM/R FWD 164RH M11 121VU COM NAV/CIDS/DEU A NORM/L FWD 163RH M10 121VU COM NAV/CIDS/DIR NORM/2 156RH M07 121VU COM NAV/CIDS/DIR NORM/1 151RH M06
R **ON A/C 106-149, 301-399, 401-499,
122VU AIR COND/CIDS/SDF/DIR NORM/2 14WH T18
122VU AIR COND/CIDS/SDF/DIR NORM/1 17WH T17
**ON A/C 301-399,
Subtask 23-73-42-865-054
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU CIDS/DEU A NORM/ MID/ LH 197RH C04
2001VU CIDS/DEU A NORM/ MID/ RH 198RH C05
2001VU CIDS/DEU A NORM/ AFT/ LH 173RH C06
2001VU CIDS/DEU A NORM/ AFT/ RH 174RH C07
2001VU CIDS/DEU B NORM/ AFT 194RH C08
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 417 1 1 Aug 01/05 1 1 1CES 1
R **ON A/C 106-149, 301-399, 401-499,
4. Procedure_________
Subtask 23-73-42-420-050
A. Installation of the connection box 208RH and 308RH.
**ON A/C 106-149,
(Ref. Fig. 401/TASK 23-73-42-991-001-B) **ON A/C 301-399,
R (Ref. Fig. 401A/TASK 23-73-42-991-001-A) **ON A/C 401-499,
R R (Ref. Fig. 401B/TASK 23-73-42-991-001-C) **ON A/C 106-149, 301-399, 401-499,
(Ref. Fig. 402/TASK 23-73-42-991-002) NOTE : The installation procedure of the connection box 208RH and 308RH____ is the same. Only one procedure is given. (1) Clean the component interface and/or the adjacent area. (2) Do an inspection of the component interface and/or the adjacent area. (3) Connect the connection box (3) to the decoder/encoder unit (1) and tighten the nylatches (4). (4) Remove the blanking caps from the electrical connectors. (5) Make sure that the electrical connectors are clean and in the correct condition.
(6) Make sure that the coding switches are in the positions recorded during the removal procedure.
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 418 1 1 Aug 01/05 1 1 1CES 1
(7)
Connect the electrical connector (2) to the connection box (3).
(8)
Safety the electrical connector (2) CAUTION : MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE
_______ CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(a) Safety the connector (2) with the spring latches (5).
Subtask 23-73-42-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 150RH, 157RH, 153RH, 158RH, 159RH, 151RH, 156RH, 162RH, 163RH, 164RH, 167RH, 168RH, 172RH, 179RH, 193RH, 195RH, 196RH, 15WH, 18WH, 14WH, 17WH
**ON A/C 301-399,
Subtask 23-73-42-865-055
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 173RH, 174RH, 197RH, 198RH, 194RH.
R **ON A/C 106-149, 301-399, 401-499,
Subtask 23-73-42-740-050
D. Do the interface and power-up test of the CIDS. (Ref. TASK 23-73-00-740-010)
1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 419 1 1 Aug 01/05 1 1 1CES 1
5. Close-up
________
**ON A/C 106-149,
Subtask 23-73-42-410-050-B
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(127)