FOR 200RH7, 200RH8
install 231WW, 232WW
-
FOR 200RH9, 200RH10
install 231ZW, 232ZW
-
FOR 200RH11, 200RH12
install 241QW, 242QW
-
FOR 200RH13, 200RH14
install 241WW, 242WW
-
FOR 200RH15, 200RH16
install 251FW, 252FW
-
FOR 200RH17, 200RH18
install 251MW, 252MW
-
FOR 200RH19, 200RH20
R 1EFF : ALL 1 23-73-46Page 434 1 1 Aug 01/05 1 1 1CES 1 install 251TW, 252TW
-
FOR 200RH21, 200RH22
install 251ZW, 252ZW
-
FOR 200RH23, 200RH24 install 251CX, 252CX (Ref. TASK 25-23-48-400-001)
(4) Install the aft utility area - ceiling panel.
-FOR 200RH25, 200RH26
install 261AC (Ref. TASK 25-23-42-400-002)
**ON A/C 106-149,
Subtask 23-73-46-410-052-D
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the related cove light panels:
-
FOR 200RH1, 200RH2 install 231JW and 232JW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH3, 200RH4 install 231WW and 232WW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH7, 200RH8 install 241QW and 242QW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH11, 200RH12 install 251FW and 252FW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH13, 200RH14 install 251TW and 252TW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH15, 200RH16 install 251ZW and 252ZW (Ref. TASK 25-23-48-400-001).
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 23-73-46Page 435 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 151-199,
Subtask 23-73-46-410-052-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the forward utility area - ceiling panel.
-FOR 200RH1, 200RH2
install 221BC (Ref. TASK 25-23-42-400-001)
(3)
Install the related cove light panel.
-
FOR 200RH3, 200RH4
install 231JW, 232JW
-
FOR 200RH5, 200RH6
install 231QW, 232QW
-
FOR 200RH7, 200RH8
install 231TW, 232TW
-
FOR 200RH9, 200RH10
install 241ZW, 242ZW
-
FOR 200RH11, 200RH12
install 241QW, 242QW
-
FOR 200RH13, 200RH14
install 241WW, 242WW
-
FOR 200RH17, 200RH18
install 251MW, 252MW
-
FOR 200RH19, 200RH20
install 251TW, 252TW
-
FOR 200RH21, 200RH22
install 251ZW, 252ZW
FOR 200RH23, 200RH24
install 251CX, 252CX (Ref. TASK 25-23-48-400-001)
1EFF : 151-199, 1 23-73-46Page 436 1 1 Aug 01/05 1 1 1CES 1 (4) Install the aft utility area - ceiling panel.
-FOR 200RH25, 200RH26
install 261AC (Ref. TASK 25-23-42-400-002)
**ON A/C 301-399,
Subtask 23-73-46-410-052-C
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the related cove light and ceiling panels:
-
FOR 200RH1, 200RH2 install 231JW and 232JW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH3, 200RH4 install 231WW and 232WW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH5, 200RH6
install 231LC (Ref. TASK 25-23-41-400-001).
-
FOR 200RH7, 200RH8 install 231XX and 232XX (Ref. TASK 25-23-48-400-001).
-
FOR 200RH9, 200RH10 install 241WW and 242WW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH11, 200RH12
install 251MC (Ref. TASK 25-23-41-400-001).
-
FOR 200RH13, 200RH14 install 251QW and 252QW (Ref. TASK 25-23-48-400-001).
-
FOR 200RH15, 200RH16 install 251ZW and 252ZW (Ref. TASK 25-23-48-400-001).
1EFF : 151-199, 301-399, 1 23-73-46Page 437 1 1 Aug 01/05 1 1 1CES 1 1EFF : ALL 1 23-73-46Page 438 1 1 Aug 01/05 1 1 1CES 1 DECODER/ENCODER UNIT B - REMOVAL/INSTALLATION
R **ON A/C 401-499,
R Subtask 23-73-46-410-052-E
R A. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other