R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 406 1 1 Aug 01/05 1 1 1CES 1R Connection Box DEU Type A/B - Component Location R Figure 401/TASK 23-73-42-991-001-B
R 1EFF : 106-149, 1 23-73-42Page 407 1 1 May 01/05 1 1 1CES 1
Connection Box DEU Type A/B - Component Location R Figure 401A/TASK 23-73-42-991-001-A
1EFF : 301-399, 1 23-73-42Page 408 1 1 May 01/05 1 1 1CES 1
R **ON A/C 401-499,
R (Ref. Fig. 401B/TASK 23-73-42-991-001-C)
R **ON A/C 106-149, 301-399, 401-499,
(Ref. Fig. 402/TASK 23-73-42-991-002)
NOTE : The removal procedure of the connection box 208RH and 308RH is the____ same. Only one procedure is given.
(1) Release the spring latches (5) and disconnect the electrical connector (2) from the connection box (3).
(2) Put blanking caps on the disconnected electrical connectors.
(3) Pull the nylatches (4) and remove the connection box (3) from the decoder/encoder unit (1).
(4) Make sure that you do not change the position of the coding switches and record them.
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 409 1 1 Aug 01/05 1 1 1CES 1R Connection Box DEU Type A/B - Component Location R Figure 401B/TASK 23-73-42-991-001-C
R 1EFF : 401-499, 1 23-73-42Page 410 1 1 Aug 01/05 1 1 1CES 1
Connection Box DEU Type A/B
Figure 402/TASK 23-73-42-991-002
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 411 1 1 Aug 01/05 1 1 1CES 1 TASK 23-73-42-400-001
Installation of the Connection Box
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific 1 STEPLADDER 0.5 M (1.6 FT)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
23-73-00-740-010 Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) via the CFDS 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power
**ON A/C 106-149,
23-73-42-991-001-B Fig. 401
**ON A/C 301-399,
23-73-42-991-001-A Fig. 401A R **ON A/C 401-499,
R 23-73-42-991-001-C Fig. 401B
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 412 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R **ON A/C 106-149, 301-399, 401-499,
23-73-42-991-002 FOR FIN 308RH1, 308RH2 25-23-42-000-001 25-23-42-400-001
FOR FIN 208RH1, 208RH2 25-23-48-000-001 25-23-48-400-001 FOR FIN 208RH3, 208RH4 25-23-48-000-001 25-23-48-400-001 FOR FIN 208RH7, 208RH8 25-23-48-000-001 25-23-48-400-001 FOR FIN 308RH5, 308RH6 25-23-41-000-001 25-23-41-400-001 25-23-48-000-001 25-23-48-400-001 FOR FIN 208RH11, 208RH12 25-23-41-000-001 25-23-41-400-001 25-23-48-000-001 25-23-48-400-001 FOR FIN 208RH13, 208RH14 25-23-48-000-001 25-23-48-400-001 FOR FIN 308RH3, 308RH4 25-23-41-000-001 25-23-41-400-001 FOR FIN 208RH5, 208RH6 25-23-41-000-001 25-23-41-400-001 FOR FIN 208RH10, 208RH9 25-23-48-000-001 25-23-48-400-001 Fig. 402
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(125)