Subtask 23-73-47-710-050-A
E. Do this test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1.
On the circuit breaker panel 121VU:
- open the circuit breakers DIR NORM/1 and DIR NORM/2 151RH and 156RH.
2.
On the circuit breaker panel 49VU:
- open the circuit breakers DIR ESS/1 and DIR ESS/2 150RH and 157RH.
-after approx. 10 s close the circuit breakers DIR ESS/1 and DIR ESS/2 150RH and 157RH.
3. On the circuit breaker panel 121VU:
-close the circuit breakers DIR NORM/1 and DIR NORM/2 151RH and 156RH.
On the Forward Attendant Panel (FAP)120RH:
-
the CIDS CAUT light comes on.
-
the CIDS CAUT light goes off.
NOTE : Wait approx. 5 minutes before you start the next test step.
____
-after approx. 5 minutes the CIDS CAUT
light stays off.
4. On the CFDS MCDU: On the CFDS MCDU:
- push the MENU pushbutton - the MCDU MENU page comes on.
switch.
R 1EFF : 151-199, 1 23-73-47Page 426 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
-
push the CFDS related line - the CFDS page comes on. selection key.
-
push the SYSTEM REPORT/TEST - the SYSTEM REPORT/TEST page comes on. related line selection key.
-
push the COM related line - the SYSTEM REPORT/TEST COM page comes selection key. on.
-
push the CIDS1 related line - the CIDS 1(ACT) page comes on.
selection key.
-
push the TEST related line - the CIDS 1(ACT) TEST page comes on. selection key.
-
push the DEU B related line - the CIDS 1(ACT) CIDS DEU B TEST page
selection key. comes on with the message:
ATA 23-73-47
TEST IN PROGRESS comes on.
-after not many seconds the TEST IN PROGRESS message changes to: TEST OK.
**ON A/C ALL
5. Close-up
________
**ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
Subtask 23-73-47-410-052
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the forward utility-area ceiling panel.
-FOR 300RH1
install 221BC (Ref. TASK 25-23-42-400-001)
1EFF : ALL 1 23-73-47Page 427 1 1 Aug 01/05R 1 1 1CES 1
(3)
Install the upper sidewall panel.
-FOR 300RH4
install 242QW (Ref. TASK 25-23-43-400-001)
(4)
Install the aft utility-area ceiling panel.
-FOR 300RH5, 300RH6
install 261CC (Ref. TASK 25-23-42-400-002)
**ON A/C 106-149,
Subtask 23-73-47-410-052-C
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the forward utility area - ceiling panel:
-FOR 300RH1
install 221BC (Ref. TASK 25-23-42-400-001).
(3)
Install the cove light panel :
-FOR 300RH6
install 242WW (Ref. TASK 25-23-48-400-001).
(4)
Install the aft utility area - ceiling panel.
-FOR 300RH7, 300RH8
install 261DF (Ref. TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT). **ON A/C 301-399,
Subtask 23-73-47-410-052-B
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the forward utility area - ceiling panel:
-FOR 300RH1
install 221BC (Ref. TASK 25-23-42-400-001).
1EFF : 001-049, 051-099, 101-149, 151-199, 1 23-73-47Page 428 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 1EFF : ALL 1 23-73-47Page 429 1 1 Aug 01/05 1 1 1CES 1 MOUNT - DEU A / DEU B - REMOVAL/INSTALLATION
(3) Install the ceiling panel : - FOR 300RH4 install 231JC (Ref. TASK 25-23-41-400-001). - FOR 300RH6 install 251KC (Ref. TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel. - FOR 300RH7, 300RH8 install 261DF (Ref. TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
R **ON A/C 401-499,
R Subtask 23-73-47-410-052-D
R A. Close Access
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(150)