• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-20 21:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

23-73-00-740-010 Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) via the CFDS 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 23-73-43-991-001 Fig. 401 23-73-43-991-002 Fig. 402 FOR FIN 209RH1, 209RH2 25-23-48-000-001 Removal of the Cove Light Panels 25-23-48-400-001 Installation of the Cove Light Panels FOR FIN 309RH1, 309RH2 25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area 25-23-42-400-002 Installation of the Ceiling Panels - Aft Utility Area
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-43Page 407 1 1 Aug 01/05 1 1 1CES 1


 3. Job Set-up__________
 Subtask 23-73-43-860-050-A
 A. Aircraft Maintenance Configuration
 (1) Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-42-00-861-001)
 (2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel. 
R  (3) FOR 209RH1, 209RH2 make sure that the cove light panels 251ZW and 252ZW (Ref. TASK 25-23-48-000-001) are removed. 
R  (4) FOR 309RH1, 309RH2 make sure that the aft utility area - ceiling panel 261DF (Ref. TASK 25-23-42-000-002) is removed.
 Subtask 23-73-43-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU AIR COND/CIDS/SDF/DIR2 ESS 18WH C06 49VU AIR COND/CIDS/SDF/DIR1 ESS 15WH C05 
R  **ON A/C 106-149, 401-499,
 49VU COM/CIDS/DIR ESS/2  157RH  G02 
R  **ON A/C 106-149, 301-399, 401-499,
 49VU COM DIR ESS/1 49VU COM/CIDS/DEU A ESS/AFT R 49VU COM/CIDS/DEU A ESS/AFT L 49VU COM/CIDS/DEU A ESS/FWD R 49VU COM/CIDS/DEU A ESS/FWD L  150RH 172RH 179RH 158RH 159RH  G01HA12HA11HA10HA09 

R 1EFF : 106-149, 301-399, 401-499, 1 23-73-43Page 408 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
**ON A/C 301-399,
 49VU COM / CIDS / DEU A ESS / MID R 49VU COM / CIDS / DEU A ESS / MID L 49VU COM/CIDS/DEU B/ESS 49VU COM DIR ESS/2 120VU COM / CIDS / DEU B / NORM FWD  196RH 195RH 153RH 157RH 193RH  G05G04G03G02M09 
R  **ON A/C 106-149, 401-499,
 121VU COM NAV/CIDS/DEU A NORM/R AFT 121VU COM NAV/CIDS/DEU A NORM/L AFT 121VU COM NAV/CIDS/DEU A NORM/R FWD 121VU COM NAV/CIDS/DEU A NORM/L FWD 121VU COM NAV/CIDS/DEU B/NORM 121VU COM NAV/CIDS/DIR NORM/2  168RH 167RH 164RH 163RH 162RH 156RH  M12M11M10M09M08M06
 **ON A/C 301-399,
 121VU COM NAV/CIDS/DEU A NORM/R FWD 121VU COM NAV/CIDS/DEU A NORM/L FWD 121VU COM NAV/CIDS/DIR NORM/2 121VU COM NAV/CIDS/DIR NORM/1  164RH 163RH 156RH 151RH  M11M10M07M06 
R  **ON A/C 106-149, 301-399, 401-499,
 122VU AIR COND/CIDS/SDF/DIR NORM/2 122VU AIR COND/CIDS/SDF/DIR NORM/1  14WH 17WH  T18T17 

R 1EFF : 106-149, 301-399, 401-499, 1 23-73-43Page 409 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 301-399,


 Subtask 23-73-43-865-054
 C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2001VU CIDS/DEU A NORM/ MID/ LH 197RH C04
 2001VU CIDS/DEU A NORM/ MID/ RH 198RH C05
 2001VU CIDS/DEU A NORM/ AFT/ LH 173RH C06
 2001VU CIDS/DEU A NORM/ AFT/ RH 174RH C07
 2001VU CIDS/DEU B NORM/ AFT 194RH C08

R **ON A/C 106-149, 301-399, 401-499,
 4. Procedure
_________
 Subtask 23-73-43-420-050

 A. Installation of the termination box 209RH and 309RH. (Ref. Fig. 401/TASK 23-73-43-991-001, 402/TASK 23-73-43-991-002)
 NOTE : The installation procedure of the termination box 209RH and 309RH
____
 is the same. Only one procedure is given.

 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Connect the termination box (3) to the decoder/encoder unit (1) and tighten the nylatches (4).

 (4)
 Remove the blanking caps from the electrical connectors.

 (5)
 Make sure that the electrical connectors are clean and in the correct condition.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(130)