- open the circuit breaker DIR 1 AND 2/NORM 151RH.
2.
On the circuit breaker panel 49VU:
- open the circuit breaker DIR 1 AND 2/ESS 150RH.
-after approx. 10 s close the circuit breaker DIR 1 AND 2/NORM 150RH.
3. On the circuit breaker panel 121VU:
-close the circuit breaker DIR 1 AND 2/ESS 151RH.
On the Forward Attendant Panel (FAP)120RH:
-
the CIDS CAUT light comes on.
-
the CIDS CAUT light goes off.
NOTE : Wait approx. 5 minutes before you start the next test step.
____
- after approx. 5 minutes the CIDS CAUT
light stays off.
4. On the CFDS MCDU: On the CFDS MCDU:
- push the MENU pushbutton - the MCDU MENU page comes on.
switch.
- push the CFDS related line - the CFDS page comes on.
selection key.
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 23-73-46Page 431 1201-299, 1Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
- push the SYSTEM REPORT/TEST related line selection key. - the SYSTEM REPORT/TEST page comes on.
- push the COM related line selection key. - the SYSTEM REPORT/TEST COM page comeson.
- push the CIDS1 related line selection key. - the CIDS 1(ACT) page comes on.
- push the TEST related line selection key. - the CIDS 1(ACT) TEST page comes on.
- push the DEU A related line selection key. - the CIDS 1(ACT) CIDS DEU A TEST pagecomes on with the message: ATA 23-73-46 TEST IN PROGRESS comes on.
- after not many seconds the TEST IN PROGRESS message changes to: TEST OK.
R **ON A/C 106-149, 301-399, 401-499,
Subtask 23-73-46-710-050-A
E. Do this test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1.
On the circuit breaker panel 121VU:
- open the circuit breakers DIR
NORM/1 and DIR NORM/2 151RH and
156RH.
2.
On the circuit breaker panel On the Forward Attendant Panel (FAP) 49VU: 120RH:
R 1EFF : ALL 1 23-73-46Page 432 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
- open the circuit breakers DIR - the CIDS CAUT light comes on.
ESS/1 and DIR ESS/2 150RH and
157RH.
-after approx. 10 s close the
circuit breakers DIR ESS/1 and
DIR ESS/2 150RH and 157RH.
3. On the circuit breaker panel 121VU:
-close the circuit breakers DIR - the CIDS CAUT light goes off.
NORM/1 and DIR NORM/2 151RH and
156RH.
NOTE : Wait approx. 5 minutes before you start the next test step.
____
4. On the CFDS MCDU:
-
push the MENU pushbutton switch.
-
push the CFDS related line selection key.
-
push the SYSTEM REPORT/TEST related line selection key.
-
push the COM related line selection key.
-
push the CIDS1 related line selection key.
-
push the GND SCANNING related line selection key.
-after approx. 5 minutes the CIDS CAUT light stays off.
On the CFDS MCDU:
-
the MCDU MENU page comes on.
-
the CFDS page comes on.
-
the SYSTEM REPORT/TEST page comes on.
-
the SYSTEM REPORT/TEST COM page comeson.
-
the CIDS 1 page comes on.
-
the CIDS 1 GROUND SCANNING page comeson with the message: IN PROGRESS 180s
-at the end of the test the message IN PROGRESS 180s goes off and the message NO FAULT DETECTED comes on.
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-46Page 433 1 1 Aug 01/05 1 1 1CES 1
**ON A/C ALL
5. Close-up
________ **ON A/C 001-049, 051-099, 101-105, 201-299,
Subtask 23-73-46-410-052
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the forward utility area - ceiling panel.
-FOR 200RH1, 200RH2
install 221BC (Ref. TASK 25-23-42-400-001)
(3)
Install the related cove light panel.
-
FOR 200RH3, 200RH4
install 231JW, 232JW
-
FOR 200RH5, 200RH6
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(142)