• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-20 21:18来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Install the forward utility area - ceiling panel:

 -FOR 308RH1, 308RH2 install 221BC and 222BC (Ref. TASK 25-23-42-400-001).

 (3)
 Install the related cove light panels:

 -
FOR 208RH1, 208RH2 install 231JW and 232JW (Ref. TASK 25-23-48-400-001).

 -
FOR 208RH3, 208RH4 install 231WW and 232WW (Ref. TASK 25-23-48-400-001).

 -
FOR 208RH7, 208RH8 install 241QW and 242QW (Ref. TASK 25-23-48-400-001).

 -
FOR 308RH5, 308RH6 install 241WW and 242WW (Ref. TASK 25-23-48-400-001).

 -
FOR 208RH11, 208RH12 install 251FW and 252FW (Ref. TASK 25-23-48-400-001).

 -
FOR 208RH13, 208RH14 install 251TW and 252TW (Ref. TASK 25-23-48-400-001).

 

 (4)
 Remove the STEPLADDER 0.5 M (1.6 FT).


 **ON A/C 301-399,
 Subtask 23-73-42-410-050-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the forward utility area - ceiling panel:


 -FOR 308RH1, 308RH2 install 221BC and 222BC (Ref. TASK 25-23-42-400-001).
 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 420 1 1 Aug 01/05 1 1 1CES 1 1EFF : 301-399, 401-499, 1 23-73-42Page 421 1 1 Aug 01/05 1 1 1CES 1 1EFF : 106-149, 301-399, 401-499, 1 23-73-42Page 422 1 1 Aug 01/05 1 1 1CES 1 TERMINATION BOX - DEU - REMOVAL/INSTALLATION


 (3) Install the related cove light and ceiling panels: - FOR 208RH1, 208RH2 install 231JW and 232JW (Ref. TASK 25-23-48-400-001). - FOR 208RH3, 208RH4 install 231WW and 232WW (Ref. TASK 25-23-48-400-001). - FOR 308RH3, 308RH4 install 231JC (Ref. TASK 25-23-41-400-001). - FOR 208RH5, 208RH6 install 231LC (Ref. TASK 25-23-41-400-001). - FOR 208RH7, 208RH8 install 231XX and 232XX (Ref. TASK 25-23-48-400-001). - FOR 208RH9, 208RH10 install 241WW and 242WW (Ref. TASK 25-23-48-400-001). - FOR 308RH5, 308RH6 install 251KC (Ref. TASK 25-23-41-400-001). - FOR 208RH11, 208RH12 install 251MC (Ref. TASK 25-23-41-400-001). - FOR 208RH13, 208RH14 install 251QW and 252QW (Ref. TASK 25-23-48-400-001).
 (4) Remove the STEPLADDER 0.5 M (1.6 FT). 
R  **ON A/C 401-499, 
R  Subtask 23-73-42-410-050-C 
R  A. Close Access 
R R  (1) Make sure that the work area is clean and clear of tool(s) and other items. 
R R R  (2) Install the forward utility area - ceiling panel: - FOR 308RH1, 308RH2 install 221BC and 222BC (Ref. TASK 25-23-42-400-001). 
R R R R R R R R R R R  (3) Install the related cove light panels: - FOR 208RH1, 208RH2 install 231JW and 232JW (Ref. TASK 25-23-48-400-001). - FOR 208RH3, 208RH4 install 231QW and 232QW (Ref. TASK 25-23-48-400-001). - FOR 208RH7, 208RH8 install 231ZW and 232ZW (Ref. TASK 25-23-48-400-001). - FOR 308RH5, 308RH6 install 241WW and 242WW (Ref. TASK 25-23-48-400-001). - FOR 208RH11, 208RH12 install 251WW and 252WW (Ref. TASK 25-23-48-400-001).

 

R R  - FOR 208RH13, 208RH14 install 251TW and 252TW (Ref. TASK 25-23-48-400-001). 
R  (4) Remove the STEPLADDER 0.5 M (1.6 FT). 
R  **ON A/C 106-149, 301-399, 401-499,
 Subtask 23-73-42-862-050
 B. De-energize the ground service network (Ref. TASK 24-42-00-862-001)

 

____________________________________________
 TASK 23-73-43-000-001
 Removal of the Termination Box
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 FOR FIN 309RH1, 309RH2
 No specific 1 STEPLADDER 0.5 M (1.6 FT)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 23-73-43-991-001 Fig. 401 23-73-43-991-002 Fig. 402 FOR FIN 209RH1, 209RH2 25-23-48-000-001 Removal of the Cove Light Panels FOR FIN 309RH1, 309RH2 25-23-42-000-002 Removal of the Ceiling Panels - Aft Utility Area
 3. Job Set-up
__________
 Subtask 23-73-43-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001)

R 1EFF : 106-149, 301-399, 401-499, 1 23-73-43Page 401 1 1 Aug 01/05 1 1 1CES 1 Subtask 23-73-43-865-050
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯4(128)