R  Monitor  
R  Figure 401/TASK 23-72-22-991-002 
 1EFF :  216-216,  1  23-72-22 Page 404  
1  1  Nov 01/04 
 1  1 
 1CES  1
 Monitor  
R  Figure 402/TASK 23-72-22-991-001 
 1EFF :  216-216,  1  23-72-22 Page 405  
1  1  Nov 01/04 
 1  1 
 1CES  1
 **ON A/C 216-216, 
 TASK 23-72-22-400-001  
R  Installation of the Cockpit-Door Surveillance-System Monitor (10RA) 
 1. Reason for the Job__________________ 
 Self Explanatory 
 2. Job Set-up Information______________________ 
 A. Referenced Information 
 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 
23-72-00-710-001 24-41-00-861-002 24-41-00-862-002  Operational Test of the Anti-Hijack Camera-Monitoring-SystemEnergize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External Power  
R  **ON A/C 216-216,  
R  Post SB  23-1208 For A/C 216-216,  
R R  23-72-22-991-002 23-72-22-991-001  Fig. 401 Fig. 402
1EFF : 216-216, 1 23-72-22Page 406 1 1 Nov 01/04 1 1 1CES 1 1EFF : 216-216, 1 23-72-22Page 407 1 1 Nov 01/04 1 1 1CES 1 1EFF : 216-216, 1 23-72-22Page 408 1 1 Nov 01/04 1 1 1CES 1
 **ON A/C 216-216, 
 3. Job Set-up__________ 
 **ON A/C 216-216, 
 Post SB  23-1208 For A/C 216-216, 
 Subtask 23-72-22-860-050 
 A. Aircraft Maintenance Configuration 
 (1) Make sure that the ground service network is energized (Ref. TASK 24-41-00-861-002) 
 Subtask 23-72-22-865-051 
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU DOORS/CKPT/VIDEO/SPLY 15RA T16 
 **ON A/C 216-216, 
 4. Procedure_________  
R  
R  **ON A/C 216-216,  
R  Post SB  23-1208 For A/C 216-216,  
R  Subtask 23-72-22-710-052  
R R  A. Installation of the Monitor or Hinge Assembly:  
R R  (1) If you want install the Monitor only: - Do the paragraph B.  
R R  (2) If you want install the Hinge Assembly: - Do the paragraph C.
R  Subtask 23-72-22-420-053  
R  B. Installation of the Monitor  
R  (Ref. Fig. 401/TASK 23-72-22-991-002)  
R  (1) Do a visual inspection of the component interface and/or the adjacent  
R  area.  
R  (2) Clean the component interface and/or the adjacent area.  
R  (3) Remove the blanking caps from the electrical connectors.  
R  (4) Make sure that the electrical connectors are clean and in the correct  
R  condition.  
R  (5) Install the Monitor (1) with the screws (3) to the hinge assembly (2)  
R  and TORQUE the screws (3) to 0.300 m.daN (26.54 lbf.in).  
R  Subtask 23-72-22-420-054  
R  C. Installation of the Hinge Assembly:  
R  (1) Do a visual inspection of the component interface and/or the adjacent  
R  area.  
R  (Ref. Fig. 402/TASK 23-72-22-991-001)  
R  (2) Clean the component interface and/or the adjacent area.  
R  (3) Install the Hinge Assembly (1) with the washers (4) and the screws  
R  (5) to the mounting plate (3).  
R  (4) Remove the blanking caps from the elevtrical connectors.  
R  (5) Make sure that the electrical connectors are clean and in the correct  
R  condition.  
R  (6) Connect the electrical connector (2). 
 Subtask 23-72-22-865-052  
R  D. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
 breaker(s): 
 15RA
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯3(35)