R 1EFF : 106-149, 301-399, 401-499, 1 23-73-00Page 525 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU COM NAV/CIDS/DEU A NORM/L FWD 121VU COM NAV/CIDS/DEU B/NORM 121VU COM NAV/CIDS/DIR NORM/2 163RH 162RH 156RH M09M08M06
R **ON A/C 106-149, 301-399, 401-499,
121VU ENGINE/ENG2/FADEC B 121VU HYDRAULIC/LGCIU/SYS2 4KS2 2GA Q40Q35
R **ON A/C 106-149, 401-499,
121VU COM/FAP1/NORM 170RH Q14
R **ON A/C 106-149, 301-399, 401-499,
121VU ENGINE/ENG1/FADEC B/AND EIU 1 4KS1 R41
**ON A/C 301-399,
121VU COM NAV/CIDS/DEU A NORM/R FWD 121VU COM NAV/CIDS/DEU A NORM/L FWD 121VU COM NAV/CIDS/DIR NORM/2 121VU COM NAV/CIDS/DIR NORM/1 121VU COM NAV/CIDS/FWD ATTND/PNL 164RH 163RH 156RH 151RH 170RH M11M10M07M06Q14
R **ON A/C 106-149, 301-399, 401-499,
122VU AIR COND/CIDS/SDF/DIR NORM/2 122VU AIR COND/CIDS/SDF/DIR NORM/1 122VU AIR COND/CAB PRESS/CTL/2 14WH 17WH 2HL T18T17Y22
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-00Page 526 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 301-399,
Subtask 23-73-00-865-203
C. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
-------------------------------------------------------------------------------
2001VU CIDS/DEU A NORM/ MID/ LH 197RH C04
2001VU CIDS/DEU A NORM/ MID/ RH 198RH C05
2001VU CIDS/DEU A NORM/ AFT/ LH 173RH C06
2001VU CIDS/DEU A NORM/ AFT/ RH 174RH C07
2001VU CIDS/DEU B NORM/ AFT 194RH C08
R **ON A/C 106-149, 301-399, 401-499,
4. Procedure
_________
Subtask 23-73-00-740-058
A. Do this test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the CFDS-MCDU: On the CFDS-MCDU:
- push the MCDU MENU related - the MCDU MENU page comes on.
pushbutton switch.
- push the CFDS related line - the CFDS page comes on.
select key.
- push the SYSTEM REPORT/TEST - the SYSTEM REPORT/TEST page comes on.
line select key.
- push the COM related line - the SYSTEM REPORT/TEST COM page comes
select key. on.
- push the CIDS1 related line - the CIDS1 page comes on.
select key.
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-00Page 527 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
- push the SYSTEM TESTS related - the CIDS1 SYSTEM TESTS DIR1 ACTIVE
line select key. page comes on.
- push the INTERFACE + POWER-UP - the CIDS1 INTERFACE + POWER-UP TEST,
TEST line select key. DIR1 ACTIVE page with the message
TEST IN PROGRESS 6 MIN comes on.
- when the TEST is finished the message
TEST OK comes on.
- push the MCDU MENU related - the MCDU MENU page comes on.
pushbutton switch.
5. Close-up________
Subtask 23-73-00-860-161
A. Put the aircraft back to its initial configuration.
(1)
Do the EIS stop procedure
(Ref. TASK 31-60-00-860-002)
(2)
De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002)
R 1EFF : 106-149, 301-399, 401-499, 1 23-73-00Page 528 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299,
TASK 23-73-00-710-002
R Operational Check for secondary Power Supply to the Directors and the DEUs and DEUs-A Cut-Off function
1.
Reason for the Job
__________________
Refer to the MPD TASK: 237300-01
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM Communications 通讯3(143)